Site search

145011 results

الصورة
Information
C
Kenya
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Development of Digital Services Export Strategy

Project Kenya Digital Economy Acceleration Project
Date posted
الحالة Closed
DB Reference No WB-P2144285-10/24
Deadline (local time):
الصورة
Finance
الصورة
Public Sector
C
South Sudan
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Treasury Advisor (24 months)

Project Public Financial Management and Institutional Strengthening Project
Date posted
الحالة Closed
DB Reference No WB-P2144284-10/24
Deadline (local time):
الصورة
Public Sector
الصورة
water, sanitation, and waste management icon
C
Peru
Inter-American Development Bank
Last updated on 14/10/2024
Favorite this item
التسمية

ELABORACIÓN DEL EXPEDIENTE TECNICO: PROGRAMA DE INSPECCIÓN Y RECTIFICACIÓN DE LAS INSTALACIONES PARA EL CONTROL DE LA INTRUSIÓN PLUVIAL EN PUERTO MALDONADO

Project PROGRAMA NACIONAL DE SANEAMIENTO URBANO (PNSU)
Date posted
الحالة Closed
DB Reference No IDB-P2144419-10/24
Deadline (local time):
الصورة
Public Sector
الصورة
water, sanitation, and waste management icon
C
Peru
Inter-American Development Bank
Last updated on 14/10/2024
Favorite this item
التسمية

ELABORACION DEL DISEÑO E IMPLEMENTACIÓN DEL PLAN DE COMUNICACIONES PARA EL SECTOR TAMBOPATA, SECTOR EL TRIUNFO Y SECTOR LA JOYA

Project PROGRAMA NACIONAL DE SANEAMIENTO URBANO (PNSU)
Date posted
الحالة Closed
DB Reference No IDB-P2144415-10/24
Deadline (local time):
الصورة
Industry
الصورة
Rural
C
Mozambique
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Advisor for Industry Transition (1)

Project Maputo Metropolitan Area Urban Mobility Project
Date posted
الحالة Closed
DB Reference No WB-P2144283-10/24
Deadline (local time):
الصورة
Construction
C
Congo, Democratic Republic of
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Contrôle et surveillance des travaux de construction d'une nouvelle usine, de réhabilitation des équipements et du réseau d'AEP à KANANGA

Project Access Governance & Reform for the Electricity and Water Sectors Project
Date posted
الحالة Closed
DB Reference No WB-P2144282-10/24
Deadline (local time):
الصورة
Education
الصورة
Information
G
Tanzania, United Republic of
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Procurement of Equipment to Upgrading SUZA LAN Infrastructure and Equipment for Upgrading Data Centre

Project Higher Education for Economic Transformation Project
Date posted
الحالة Open
DB Reference No WB-P2144277-10/24
Deadline (local time):
الصورة
Rural
الصورة
transportation
W
Nigeria
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

56.56km Rural Roads Upgrading Phase 2

Project Nigeria Rural Access and Agricultural Marketing Project
Date posted
الحالة Open
DB Reference No WB-P2144276-10/24
Deadline (local time):
الصورة
agriculture
W
India
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Management of exotic species i.e. eradication of Lantana and other invasive alien species area 100 ha under DPO Una during 2024-25

Project Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
Date posted
الحالة Closed
DB Reference No WB-P2144275-10/24
Deadline (local time):
الصورة
Energy
G
Brazil
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Aquisição de 960 litros de gasolina para suporte às atividades de monitoramento de quelônios, a serem realizadas ao longo de quatro meses (outubro a janeiro de 2024) no município de Itamarati-AM, atendendo 8 monitores.

Project Amazon Sustainable Landscapes Project
Date posted
الحالة Closed
DB Reference No WB-P2144274-10/24
Deadline (local time):
الصورة
Construction
الصورة
transportation
W
India
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Construction of footbridges for APO Una under DPO Una HP during 2024-25.

Project Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
Date posted
الحالة Closed
DB Reference No WB-P2144273-10/24
Deadline (local time):
الصورة
Information
G
Ethiopia
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Supply of servers and storage for e-services

Project Ethiopia Digital Foundations Project
Date posted
الحالة Open
DB Reference No WB-P2144272-10/24
Deadline (local time):
الصورة
Construction
الصورة
transportation
W
India
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Construction of footbridges for APO THK under DPO Una HP during 2024-25

Project Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
Date posted
الحالة Closed
DB Reference No WB-P2144270-10/24
Deadline (local time):
الصورة
agriculture
الصورة
Rural
W
Nigeria
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Physical Improvement of 3 Nos Agro-logistics Centers (ALCs) in Ogun State

Project Nigeria Rural Access and Agricultural Marketing Project
Date posted
الحالة Open
DB Reference No WB-P2144269-10/24
Deadline (local time):
الصورة
transportation
G
India
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Ancillary Boats - Procurement of Ancillary Units for Dredgers ( Work Boats + Accommodation Boats)

Project Capacity Augmentation of the National Waterway- 1 (JAL MARG VIKAS) Project
Date posted
الحالة Open
DB Reference No WB-P2144268-10/24
Deadline (local time):
الصورة
Information
G
Ethiopia
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Procurement of Design, and Implementation of Seven Data Hubs for Electronic Medical Record (EMR) infrastructure in Ethiopia ( Design, supply, construction, installation Training, and commissioning of Regional data hubs.)

Project Ethiopia COVID-19 Emergency Response
Date posted
الحالة Open
DB Reference No WB-P2144267-10/24
Deadline (local time):
الصورة
Energy
G
Brazil
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Aquisição de 600 litros de gasolina para apoio às atividades de monitoramento de quelônios, a serem realizadas ao longo de quatro meses (outubro a janeiro de 2024) no município de Juruá-AM, atendendo 4 monitores.

Project Amazon Sustainable Landscapes Project
Date posted
الحالة Closed
DB Reference No WB-P2144266-10/24
Deadline (local time):
الصورة
Information
N
Pakistan
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Printing of QR Code Stickers for Door-to-Door Survey in Phase-1 Districts.

Project Punjab Urban Land Systems Enhancement Project
Date posted
الحالة Closed
DB Reference No WB-P2144265-10/24
Deadline (local time):
الصورة
Education
W
Kyrgyzstan
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Procurement of civil works for 2 schools: Lot 1 School named after S. Dyuishembiev for 150 student pl. in the village Kok-Dobo, Manas raiyon, Talas oblast. Lot 2 Urmaral secondary school named after D. Moldogazy for 150 student pl. in the village Madaniya

Project Enhancing Resilience in Kyrgyzstan Project
Date posted
الحالة Open
DB Reference No WB-P2144263-10/24
Deadline (local time):
الصورة
transportation
G
Angola
World Bank
Last updated on 14/10/2024
Favorite this item
التسمية

Procurement of 2 Refrigerated Trucks

Project Angola COVID-19 Strategic Preparedness And Response Project
Date posted
الحالة Open
DB Reference No WB-P2144262-10/24
Deadline (local time):