Site search

144978 results

图像
Energy
G
Brazil
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Aquisição de combustível (gasolina e GLP) para apoio às atividades de monitoramento de quelônios, a serem realizadas entre outubro e dezembro de 2024, em Carauari-AM, atendendo 56 monitores.

Project Amazon Sustainable Landscapes Project
发布日期
状态 Closed
DB Reference No WB-P2144258-10/24
Deadline (local time):
图像
water, sanitation, and waste management icon
C
Argentina
Government Organization
Last updated on 14/10/2024
Favorite this item
标签

Servicio de Consultoría para la Evaluación de la calidad del agua de los vuelcos cloacales de urbanizaciones cerradas en la Cuenca del Río Luján

Project Ministerio de Infraestructura y Servicios Públicos
发布日期
状态 Open
DB Reference No GN-P2144422-10/24
Deadline (local time):
图像
Energy
G
Brazil
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Aquisição de 1.500 litros de diesel para gerador de energia, destinado ao evento de encerramento do monitoramento de quelônios, com 600 participantes, em Xibauá. O evento ocorrerá em novembro ou dezembro (data a definir).

Project Amazon Sustainable Landscapes Project
发布日期
状态 Closed
DB Reference No WB-P2144257-10/24
Deadline (local time):
图像
Rural
图像
transportation
W
Nigeria
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Spot Improvement of 116km Rural Roads (4 Lots)

Project Nigeria Rural Access and Agricultural Marketing Project
发布日期
状态 Closed
DB Reference No WB-P2144256-10/24
Deadline (local time):
图像
Finance
图像
Public Sector
C
Chad
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Recrutement d'un cabinet pour les études technique (APS/ADP/DAO) et suivi des travaux de l'alvéole de Gassi

Project N’Djamena Urban Resilience Project
发布日期
状态 Closed
DB Reference No WB-P2144290-10/24
Deadline (local time):
图像
Industry
C
Mozambique
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Advisor for Industry Transition (2)

Project Maputo Metropolitan Area Urban Mobility Project
发布日期
状态 Closed
DB Reference No WB-P2144289-10/24
Deadline (local time):
图像
Information
C
Kenya
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Development of Digital Services Export Strategy

Project Kenya Digital Economy Acceleration Project
发布日期
状态 Closed
DB Reference No WB-P2144285-10/24
Deadline (local time):
图像
Finance
图像
Public Sector
C
South Sudan
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Treasury Advisor (24 months)

Project Public Financial Management and Institutional Strengthening Project
发布日期
状态 Closed
DB Reference No WB-P2144284-10/24
Deadline (local time):
图像
Public Sector
图像
water, sanitation, and waste management icon
C
Peru
Inter-American Development Bank
Last updated on 14/10/2024
Favorite this item
标签

ELABORACIÓN DEL EXPEDIENTE TECNICO: PROGRAMA DE INSPECCIÓN Y RECTIFICACIÓN DE LAS INSTALACIONES PARA EL CONTROL DE LA INTRUSIÓN PLUVIAL EN PUERTO MALDONADO

Project PROGRAMA NACIONAL DE SANEAMIENTO URBANO (PNSU)
发布日期
状态 Closed
DB Reference No IDB-P2144419-10/24
Deadline (local time):
图像
Public Sector
图像
water, sanitation, and waste management icon
C
Peru
Inter-American Development Bank
Last updated on 14/10/2024
Favorite this item
标签

ELABORACION DEL DISEÑO E IMPLEMENTACIÓN DEL PLAN DE COMUNICACIONES PARA EL SECTOR TAMBOPATA, SECTOR EL TRIUNFO Y SECTOR LA JOYA

Project PROGRAMA NACIONAL DE SANEAMIENTO URBANO (PNSU)
发布日期
状态 Closed
DB Reference No IDB-P2144415-10/24
Deadline (local time):
图像
Industry
图像
Rural
C
Mozambique
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Advisor for Industry Transition (1)

Project Maputo Metropolitan Area Urban Mobility Project
发布日期
状态 Closed
DB Reference No WB-P2144283-10/24
Deadline (local time):
图像
Construction
C
Congo, Democratic Republic of
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Contrôle et surveillance des travaux de construction d'une nouvelle usine, de réhabilitation des équipements et du réseau d'AEP à KANANGA

Project Access Governance & Reform for the Electricity and Water Sectors Project
发布日期
状态 Closed
DB Reference No WB-P2144282-10/24
Deadline (local time):
图像
Education
图像
Information
G
Tanzania, United Republic of
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Procurement of Equipment to Upgrading SUZA LAN Infrastructure and Equipment for Upgrading Data Centre

Project Higher Education for Economic Transformation Project
发布日期
状态 Open
DB Reference No WB-P2144277-10/24
Deadline (local time):
图像
Rural
图像
transportation
W
Nigeria
World Bank
Last updated on 14/10/2024
Favorite this item
标签

56.56km Rural Roads Upgrading Phase 2

Project Nigeria Rural Access and Agricultural Marketing Project
发布日期
状态 Open
DB Reference No WB-P2144276-10/24
Deadline (local time):
图像
agriculture
W
India
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Management of exotic species i.e. eradication of Lantana and other invasive alien species area 100 ha under DPO Una during 2024-25

Project Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态 Closed
DB Reference No WB-P2144275-10/24
Deadline (local time):
图像
Energy
G
Brazil
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Aquisição de 960 litros de gasolina para suporte às atividades de monitoramento de quelônios, a serem realizadas ao longo de quatro meses (outubro a janeiro de 2024) no município de Itamarati-AM, atendendo 8 monitores.

Project Amazon Sustainable Landscapes Project
发布日期
状态 Closed
DB Reference No WB-P2144274-10/24
Deadline (local time):
图像
Construction
图像
transportation
W
India
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Construction of footbridges for APO Una under DPO Una HP during 2024-25.

Project Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态 Closed
DB Reference No WB-P2144273-10/24
Deadline (local time):
图像
Information
G
Ethiopia
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Supply of servers and storage for e-services

Project Ethiopia Digital Foundations Project
发布日期
状态 Open
DB Reference No WB-P2144272-10/24
Deadline (local time):
图像
Construction
图像
transportation
W
India
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Construction of footbridges for APO THK under DPO Una HP during 2024-25

Project Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态 Closed
DB Reference No WB-P2144270-10/24
Deadline (local time):
图像
agriculture
图像
Rural
W
Nigeria
World Bank
Last updated on 14/10/2024
Favorite this item
标签

Physical Improvement of 3 Nos Agro-logistics Centers (ALCs) in Ogun State

Project Nigeria Rural Access and Agricultural Marketing Project
发布日期
状态 Open
DB Reference No WB-P2144269-10/24
Deadline (local time):