Site search

144285 results

图像
Finance
W
Regional - Africa
World Bank
Last updated on 23/05/2013
Favorite this item
标签

Mise en place d’un système de gestion de la Balance des Paiements et de la Position Extérieure Globale

Project Projet de Renforcement des Capacités des Institutions Régionales de la CEMAC
发布日期
状态 Closed
DB Reference No WB-P437825-05/13
Deadline (local time):
图像
Finance
W
Regional - Africa
World Bank
Last updated on 23/05/2013
Favorite this item
标签

Mise en place de la Base de Données Economiques, Monétaires et Financières (BDEMF) de la CEMAC

Project Projet de Renforcement des Capacités des Institutions Régionales de la CEMAC
发布日期
状态 Closed
DB Reference No WB-P437822-05/13
Deadline (local time):
图像
Miscellaneous
C
Serbia
World Bank
Last updated on 23/05/2013
Favorite this item
标签

e-Consult: Tax Compliance Cost Survey in Serbia

Project Southeast Europe Tax Transparency and Simplification Program
发布日期
状态 Closed
DB Reference No WB-P437819-05/13
Deadline (local time):
图像
Miscellaneous
W
Nicaragua
Inter-American Development Bank
Last updated on 23/05/2013
Favorite this item
标签

Anuncio General de Adquisiciones: Programa de Redes Integradas de Salud

Project Programa de Redes Integradas de Salud
发布日期
状态 N/A
DB Reference No IDB-P437816-05/13
图像
transportation
W
Peru
Inter-American Development Bank
Last updated on 23/05/2013
Favorite this item
标签

Anuncio General de Adquisiciones: Proyecto de Rehabilitación y Mejoramiento de la carretera Lima – Canta – La Viuda - Unish

Project Proyecto de Rehabilitación y Mejoramiento de la carretera Lima – Canta – La Viuda - Unish
发布日期
状态 N/A
DB Reference No IDB-P437813-05/13
图像
agriculture
G
Ethiopia
World Bank
Last updated on 23/05/2013
Favorite this item
标签

Supply, Delivery and Installation of Semen Laboratory Equipment, Liquid Nitrogen Plant and Dummy Cow

Project Eastern Africa Agricultural Productivity Project
发布日期
状态 Closed
DB Reference No WB-P437810-05/13
Deadline (local time):
图像
Social services
N
Nicaragua
Inter-American Development Bank
Last updated on 23/05/2013
Favorite this item
标签

Anuncio General de Adquisiciones: Programa de Acompañamiento a la Implementación de la Política Nacional de la Primera Infancia en comunidades priorizadas

Project Programa de Acompañamiento a la Implementación de la Política Nacional de la Primera Infancia en comunidades priorizadas
发布日期
状态 N/A
DB Reference No IDB-P437807-05/13
图像
Miscellaneous
C
Lao People's Democratic Republic
World Bank
Last updated on 23/05/2013
Favorite this item
标签

Individual Consultants Services for PAW

Project Protected Area and Wildlife Project
发布日期
状态 Closed
DB Reference No WB-P437804-05/13
Deadline (local time):
图像
Miscellaneous
C
Madagascar
World Bank
Last updated on 23/05/2013
Favorite this item
标签

Recrutement Assistant Technique International REDD

Project Projet d'Appui au Troisième Programme Environnemental (PE3)
发布日期
状态 Closed
DB Reference No WB-P437801-05/13
Deadline (local time):
图像
Rural
W
Senegal
World Bank
Last updated on 23/05/2013
Favorite this item
标签

Travaux de drainage et d’aménagement urbain des bassins et voiries de la phase 1 (Secteur 1 [Dalifort] et Secteur 2 [Bagdad, Wakhinane])

Project Projet de Gestion des Eaux Pluviales et d'Adaptation aux Changements Climatiques (PROGEP)
发布日期
状态 Closed
DB Reference No WB-P437798-05/13
Deadline (local time):
图像
Energy
G
Bolivia
Inter-American Development Bank
Last updated on 23/05/2013
Favorite this item
标签

Suministro de Estructuras Metálicas Auto Soportadas

Project Proyecto Línea de Transmisión Eléctrica 115 kV Yucumo – San Buenaventura
发布日期
状态 Closed
DB Reference No IDB-P437795-05/13
Deadline (local time):
图像
transportation
G
Brazil
Inter-American Development Bank
Last updated on 23/05/2013
Favorite this item
标签

<B>2nd UPDATE</B> - Aquisição de aeronave tipo helicóptero biturbina, categoria leve com capacidade de transporte de 02 (dois) pilotos, em duplo comando e 06 (seis) passageiros.

Project Programa de Recuperação Socioambiental da Serra do Mar e Sistema de Mosaicos da Mata Atlântica
发布日期
状态 Closed
DB Reference No IDB-P437792-05/13
Deadline (local time):
图像
Miscellaneous
C
Albania
World Bank
Last updated on 23/05/2013
Favorite this item
标签

Advisory support to the MoF in preparing the functional and technical specifications for full packages of AFMIS and IPSIS solutions

Project Capacity Building and Support to Implement the Integrated Planning System (IPS 2) in Albania
发布日期
状态 Closed
DB Reference No WB-P437789-05/13
Deadline (local time):
图像
Miscellaneous
C
Palestine, State of
World Bank
Last updated on 23/05/2013
Favorite this item
标签

Data/Statistics Expert

Project Government Services for Business Development Project
发布日期
状态 Closed
DB Reference No WB-P437786-05/13
Deadline (local time):
图像
Miscellaneous
G
Myanmar
United Nations Office for Project Services (UNOPS)
Last updated on 23/05/2013
Favorite this item
标签

Supply of CD4 machine and other equipment

Project United Nations Office for Project Services (UNOPS)
发布日期
状态 Closed
DB Reference No UN-P437783-05/13
Deadline (local time):
图像
water, sanitation, and waste management icon
C
Vietnam
World Bank
Last updated on 23/05/2013
Favorite this item
标签

Water Quality Model - Optimizing Management of Reservoir Water Quality

Project Trung Son Hydropower Project
发布日期
状态 Closed
DB Reference No WB-P437780-05/13
Deadline (local time):
图像
agriculture
C
Vietnam
World Bank
Last updated on 23/05/2013
Favorite this item
标签

<B>UPDATE</B> - Changes Monitoring and Guiding to Fish Breeding and Fishing

Project <B>UPDATE</B> - Trung Son Hydropower Project
发布日期
状态 Closed
DB Reference No WB-P437777-05/13
Deadline (local time):
图像
water, sanitation, and waste management icon
C
Brazil
World Bank
Last updated on 23/05/2013
Favorite this item
标签

Water Resources State Plan of the State of Goiás

Project Federal Integrated Water Sector Project - INTERÁGUAS
发布日期
状态 Closed
DB Reference No WB-P437774-05/13
Deadline (local time):
图像
water, sanitation, and waste management icon
C
South Sudan
World Bank
Last updated on 23/05/2013
Favorite this item
标签

Support to Water Supply PPPs in Kajo Keji and in Nimule, South Sudan

Project AFRICA CORE MDTF
发布日期
状态 Closed
DB Reference No WB-P437771-05/13
Deadline (local time):
图像
Finance
C
Nigeria
World Bank
Last updated on 23/05/2013
Favorite this item
标签

eConsult: Financial Infrastructure Consultant for Nigeria

Project Financial Infrastructure in Sub Saharan Africa
发布日期
状态 Closed
DB Reference No WB-P437768-05/13
Deadline (local time):