图像
Site search
144978 results
C
Ecuador
Inter-American Development Bank
Last updated on 25/03/2013
Favorite this item
标签
Simplificación o eliminación de los trámites previos para la recepción de 24 servicios institucionales, en base a un análisis del marco legal, de talento humano, de tecnología y el uso del requerimiento en el proceso de prestación del servicio
Project
Programa de Reforma Institucional de la Gestión Pública
发布日期
状态
Closed
DB Reference No
IDB-P433001-03/13
Deadline (local time):
图像
N
Regional - Latin America and The Caribbean
Inter-American Development Bank
Last updated on 25/03/2013
Favorite this item
标签
Climate Change and Urban Development Studies for the following cities: Cuenca (Ecuador), Asunción (Paraguay), Quetzaltenango (Guatemala), a city in Mexico, and the Northern Development Corridor in Haiti
Project
Climate Change and Urban Development Studies
发布日期
状态
Closed
DB Reference No
IDB-P432998-03/13
Deadline (local time):
图像
W
Vietnam
Asian Development Bank
Last updated on 25/03/2013
Favorite this item
标签
ICB A1 Civil Works (Km 0+600 – Km 7+900)
Project
Greater Mekong Subregion Ben Luc – Long Thanh Expressway Project
发布日期
状态
Closed
DB Reference No
ADB-P432995-03/13
Deadline (local time):
图像
W
Vietnam
Asian Development Bank
Last updated on 25/03/2013
Favorite this item
标签
ICB A2-1 Civil Works (Km7+900 – Km11+200)
Project
Greater Mekong Subregion Ben Luc – Long Thanh Expressway Project
发布日期
状态
Closed
DB Reference No
ADB-P432992-03/13
Deadline (local time):
图像
C
Bolivia
Inter-American Development Bank
Last updated on 25/03/2013
Favorite this item
标签
<B>REVISED</B> - Elaboración de un paquete de normativas e instrumentos para salas especializadas de estimulación temprana para el tratamiento de rezagos en ninõs/as de 0 a 6 años
Project
Programa de Desarrollo Infantil Temprano “Crecer Bien para Vivir Bien”
发布日期
状态
Closed
DB Reference No
IDB-P432989-03/13
Deadline (local time):
图像
C
Bolivia
Inter-American Development Bank
Last updated on 25/03/2013
Favorite this item
标签
<B>REVISED</B> - Elaboración de un paquete integral de estandares de calidad para centros infantiles en Bolivia
Project
Programa de Desarrollo Infantil Temprano “Crecer Bien para Vivir Bien”
发布日期
状态
Closed
DB Reference No
IDB-P432986-03/13
Deadline (local time):
图像
C
Bolivia
Inter-American Development Bank
Last updated on 25/03/2013
Favorite this item
标签
<B>REVISED</B> - Diseño e implementación de la capacitación y/o formación de recursos humanos para centros infantiles y brigadas móviles
Project
Programa de Desarrollo Infantil Temprano “Crecer Bien para Vivir Bien”
发布日期
状态
Closed
DB Reference No
IDB-P432983-03/13
Deadline (local time):
图像
W
Vietnam
Asian Development Bank
Last updated on 25/03/2013
Favorite this item
标签
ICB A2-2 Civil Works (Km11+200 – Km16+600)
Project
Greater Mekong Subregion Ben Luc – Long Thanh Expressway Project
发布日期
状态
Closed
DB Reference No
ADB-P432980-03/13
Deadline (local time):
图像
C
Afghanistan
World Bank
Last updated on 25/03/2013
Favorite this item
标签
International Program Advisor
Project
Rural Enterprise Development Program
发布日期
状态
Closed
DB Reference No
WB-P432977-03/13
Deadline (local time):
图像
W
China
World Bank
Last updated on 25/03/2013
Favorite this item
标签
General Procurement Notice (GPN): Jiangxi Poyang Lake Basin and Eco-Economic Zone Small Town Development Project
Project
Jiangxi Poyang Lake Basin and Eco-Economic Zone Small Town Development Project
发布日期
状态
N/A
DB Reference No
WB-P432974-03/13
图像
C
Angola
World Bank
Last updated on 25/03/2013
Favorite this item
标签
<B>UPDATE</B> - Consultancy Services For Design Checking and Works Supervision of Network and House Connections In Peri Urban Areas of Ndalatando
Project
<B>UPDATE</B> - Water Sector Institutional Development Project (WSIDP)
发布日期
状态
Closed
DB Reference No
WB-P432971-03/13
Deadline (local time):
图像
C
Afghanistan
World Bank
Last updated on 25/03/2013
Favorite this item
标签
International Lab Design Specialist
Project
Agricultural Inputs Project
发布日期
状态
Closed
DB Reference No
WB-P432968-03/13
Deadline (local time):
图像
C
Afghanistan
World Bank
Last updated on 25/03/2013
Favorite this item
标签
Consulting Services– Firms Selection for CASA-1000 Project
Project
Power System Development Project
发布日期
状态
Closed
DB Reference No
WB-P432965-03/13
Deadline (local time):
图像
G
Mongolia
Millennium Challenge Corporation
Last updated on 25/03/2013
Favorite this item
标签
Procurement of TVET Technical Trades Training Equipment
Project
Millennium Challenge Account - Mongolia
发布日期
状态
Closed
DB Reference No
MCC-P432962-03/13
Deadline (local time):
图像
C
Yemen
World Bank
Last updated on 25/03/2013
Favorite this item
标签
<B>UPDATE</B> - Integrator to provide Support for the Implementation of the Climate Information
Project
<B>UPDATE</B> - Pilot Program for Climate Resilience
发布日期
状态
Closed
DB Reference No
WB-P432959-03/13
Deadline (local time):
图像
W
Burkina Faso
Millennium Challenge Corporation
Last updated on 25/03/2013
Favorite this item
标签
General Procurement Notice: Procurement for the period from March 1, 2013 to August 31, 2013
Project
Millennium Challenge Account - Burkina Faso
发布日期
状态
N/A
DB Reference No
MCC-P432956-03/13
图像
C
Brazil
World Bank
Last updated on 25/03/2013
Favorite this item
标签
Consulting Services For Development of a Toolkit For the Preparation and Implementation of PPP For the State of Sao Paulo
Project
Sao Paulo Feeder Roads Project
发布日期
状态
Closed
DB Reference No
WB-P432953-03/13
Deadline (local time):
图像
C
Nigeria
Government Organization
Last updated on 25/03/2013
Favorite this item
标签
Design Review of the Port Harcourt Water Supply and Sanitation Project
Project
Port Harcourt Water Supply and Sanitation Project
发布日期
状态
Closed
DB Reference No
GN-P432950-03/13
Deadline (local time):
图像
W
Vietnam
Asian Development Bank
Last updated on 25/03/2013
Favorite this item
标签
ICB A3 Civil Works (Km 16+600 – Km 18+713,5)
Project
Greater Mekong Subregion Ben Luc – Long Thanh Expressway Project
发布日期
状态
Closed
DB Reference No
ADB-P432947-03/13
Deadline (local time):
图像
G
El Salvador
Banco Centro Americano de Integración Económica
Last updated on 25/03/2013
Favorite this item
标签
Equipo para tratamiento infantil, equipo de ventilación y anestesia, equipo para colposcopia y equipo de electromedicina
Project
Construcción y Equipamiento del Hospital Nacional de Maternidad, San Salvador, Fase equipamiento médico
发布日期
状态
Closed
DB Reference No
BCIE-P432944-03/13
Deadline (local time):