Site search

145032 results

图像
Medical
G
Argentina
World Bank
Last updated on 13/03/2013
Favorite this item
标签

<B>UPDATE</B> - Adquisición de Medicamentos de 1° y 2° línea Tuberculosis para el Programa Nacional de Control de la Tuberculosis

Project <B>UPDATE</B> - Essential Public Health Functions II
发布日期
状态 Closed
DB Reference No WB-P432164-03/13
Deadline (local time):
图像
water, sanitation, and waste management icon
C
El Salvador
Banco Centro Americano de Integración Económica
Last updated on 12/03/2013
Favorite this item
标签

Proyecto de eficiencia energética etapa No. 1: diagnostico para la instalación de variadores de frecuencia, potencia necesaria de motores eléctricos existentes y subestaciones eléctricas en plantas de bombeo y rebombeo

Project Programa de Cooperación Técnica Regional y Cooperación para Preinversión (FONTEC)
发布日期
状态 Closed
DB Reference No BCIE-P432077-03/13
Deadline (local time):
图像
water, sanitation, and waste management icon
C
Guatemala
Inter-American Development Bank
Last updated on 12/03/2013
Favorite this item
标签

19 Estudios de Preinversion de proyectos de agua potable y alcantarillado sanitario de áreas urbanas en seis (6) departamentos

Project Programa de Agua Potable y Saneamiento para el Desarrollo Humano (Fase I)
发布日期
状态 Closed
DB Reference No IDB-P432074-03/13
Deadline (local time):
图像
water, sanitation, and waste management icon
C
Guatemala
Inter-American Development Bank
Last updated on 12/03/2013
Favorite this item
标签

Identificación para prefactibilidades y factibilidades (diseño final o diseños de construcción) de proyectos de Agua Potable y Saneamiento del área rural en diez (10) Municipios (B)

Project Programa de Agua Potable y Saneamiento para el Desarrollo Humano (Fase I)
发布日期
状态 Closed
DB Reference No IDB-P432071-03/13
Deadline (local time):
图像
water, sanitation, and waste management icon
C
Guatemala
Inter-American Development Bank
Last updated on 12/03/2013
Favorite this item
标签

Identificación para prefactibilidades y factibilidades (diseño final o diseños de construcción) de proyectos de Agua Potable y Saneamiento del área rural en diez (10) Municipios (A)

Project Programa de Agua Potable y Saneamiento para el Desarrollo Humano (Fase I)
发布日期
状态 Closed
DB Reference No IDB-P432068-03/13
Deadline (local time):
图像
water, sanitation, and waste management icon
C
Guatemala
Inter-American Development Bank
Last updated on 12/03/2013
Favorite this item
标签

357 Estudios de Prefactibilidad y 80 Estudios de Factibilidad (Diseño final o diseños de construcción) de proyectos de agua potable y Saneamiento del área rural en doce (12) departamentos

Project Programa de Agua Potable y Saneamiento para el Desarrollo Humano (Fase I)
发布日期
状态 Closed
DB Reference No IDB-P432065-03/13
Deadline (local time):
图像
Miscellaneous
C
Cameroon
World Bank
Last updated on 12/03/2013
Favorite this item
标签

Recrutement d un Consultant pour la revue des fonctions du Regulateur, le developpement du manuel de procedures et le renforcement des capacites pour la mise en oeuvre de la regulation

Project Energy Sector Development SIL (FY08)
发布日期
状态 Closed
DB Reference No WB-P432062-03/13
Deadline (local time):
图像
Miscellaneous
C
Cameroon
World Bank
Last updated on 12/03/2013
Favorite this item
标签

Recrutement d un Consultant pour la revue des fonctions du Regulateur, le developpement du manuel de procedures et le renforcement des capacites pour la mise en oeuvre de la regulation

Project Energy Sector Development SIL (FY08)
发布日期
状态 Closed
DB Reference No WB-P432059-03/13
Deadline (local time):
图像
Construction
W
India
World Bank
Last updated on 12/03/2013
Favorite this item
标签

<B>UPDATE</B> - Construction for Widening & Strengthening of existing carriageway to 2-lane road from Duhuria to Chandbali ( Km. 49/000 to Km.99/000 of SH – 9A and Km 45/000 to Km 51/500 of SH-9)

Project <B>UPDATE</B> - Orissa State Roads
发布日期
状态 Closed
DB Reference No WB-P432056-03/13
Deadline (local time):
图像
Energy
C
Regional - Europe and Central Asia
European Bank for Reconstruction and Development
Last updated on 12/03/2013
Favorite this item
标签

Regional: CEEP II- Implementation Support - Project Consultant

Project CEEP II - Implementation Support
发布日期
状态 Closed
DB Reference No EBRD-P432053-03/13
Deadline (local time):
图像
Construction
W
India
World Bank
Last updated on 12/03/2013
Favorite this item
标签

Construction for Widening & Strengthening of existing carriageway to 2-lane road from Jagatpur to Duhuria ( Km. 0/0 to Km. 49/0 of SH – 9A)

Project Odisha State Roads Project
发布日期
状态 Closed
DB Reference No WB-P432050-03/13
Deadline (local time):
图像
Miscellaneous
C
India
World Bank
Last updated on 12/03/2013
Favorite this item
标签

e-Consult: Impact Assessment study of Metro rail systems in India

Project Australia-South Asia Region Infrastructure for Growth Trust Fund
发布日期
状态 Closed
DB Reference No WB-P432047-03/13
Deadline (local time):
图像
Energy
C
Regional - Europe and Central Asia
European Bank for Reconstruction and Development
Last updated on 12/03/2013
Favorite this item
标签

Regional: CEEP II- Implementation Support - Verification Consultant

Project CEEP II - Implementation Support
发布日期
状态 Closed
DB Reference No EBRD-P432044-03/13
Deadline (local time):
图像
Miscellaneous
C
Cambodia
World Bank
Last updated on 12/03/2013
Favorite this item
标签

e-Consult: Program for the Development of the Agro Industry Sector in Cambodia (1) for the Period from January 1, 2008 to December 31, 2012

Project Consultancy Assignment on Rice Export Promotion, Cambodian Rice Sector Support Project (RSSP), Sustainable Business Advisory.
发布日期
状态 Closed
DB Reference No WB-P431999-03/13
Deadline (local time):
图像
water, sanitation, and waste management icon
图像
Construction
C
Vietnam
World Bank
Last updated on 12/03/2013
Favorite this item
标签

Regional Expert for Panel of Experts of Dam Safety (POE)

Project Managing Natural Hazards Project
发布日期
状态 Closed
DB Reference No WB-P431996-03/13
Deadline (local time):
图像
agriculture
C
Vietnam
World Bank
Last updated on 12/03/2013
Favorite this item
标签

4WD Vehicles for project districts (HH35)

Project Forest Sector Development Project
发布日期
状态 Closed
DB Reference No WB-P431993-03/13
Deadline (local time):
图像
Energy
G
Tonga
World Bank
Last updated on 12/03/2013
Favorite this item
标签

<B>UPDATE</B> - Evaluation of Proposal to Supply, Store and Distribute Petroleum and Petroleum Products in Tonga

Project <B>UPDATE</B> - Energy Roadmap Institutional and Regulatory Framework Strengthening Project
发布日期
状态 Closed
DB Reference No WB-P431990-03/13
Deadline (local time):
图像
Energy
G
Yemen
World Bank
Last updated on 12/03/2013
Favorite this item
标签

Medium Voltage Overhead Lines (11kV), Distribution Transformers; Three Phase 11/0.415kV and Various Sizes of XLPE Low Voltage Network and Consumers Connections Eqpt

Project Rural Energy Access Project
发布日期
状态 Closed
DB Reference No WB-P431987-03/13
Deadline (local time):
图像
Construction
图像
Social services
W
Vietnam
World Bank
Last updated on 12/03/2013
Favorite this item
标签

Rehabilitation of 5 bridges on National Waterway Corridor 2

Project Mekong Delta Transport Infrastructure Development Project
发布日期
状态 Closed
DB Reference No WB-P432041-03/13
Deadline (local time):
图像
agriculture
C
Afghanistan
World Bank
Last updated on 12/03/2013
Favorite this item
标签

Hiring of International Experimental Design Specialist/Statistician

Project Agricultural Inputs Project
发布日期
状态 Closed
DB Reference No WB-P432038-03/13
Deadline (local time):