Site search

144982 results

Imagen
Miscellaneous
C
Mozambique
World Bank
Last updated on 07/05/2015
Favorite this item
Etiqueta

Design CRA Monitoring Information System and IBNet Data Collection Platform

Project Greater Maputo Water Supply Expansion Project (GMWSP)
Date posted
Estado Closed
DB Reference No WB-P335546-05/15
Deadline (local time):
Imagen
Miscellaneous
C
Niger
World Bank
Last updated on 07/05/2015
Favorite this item
Etiqueta

Recrutement d’un cabinet international pour le développement d’un module hors SIG pour le Volet Accompagnement Et maintenance du SIG du Projet Filets Sociaux

Project Projet Filets Sociaux
Date posted
Estado Closed
DB Reference No WB-P335543-05/15
Deadline (local time):
Imagen
Miscellaneous
C
Mozambique
World Bank
Last updated on 07/05/2015
Favorite this item
Etiqueta

Consulting Services (“the Services”) include Provision of Ongoing Technical Assistance and Support to Strengthen the Sport Hunting Sector in Mozambique.

Project Mozbio 1 - Conservation Areas for Biodiversity and Development
Date posted
Estado Closed
DB Reference No WB-P335540-05/15
Deadline (local time):
Imagen
Miscellaneous
C
Mozambique
World Bank
Last updated on 07/05/2015
Favorite this item
Etiqueta

Inquérito Socioeconómico familiar e discussões participativas do grupo focal

Project Áreas de Conservação de Biodiversidade e Desenvolvimento (Mozbio)
Date posted
Estado Closed
DB Reference No WB-P335537-05/15
Deadline (local time):
Imagen
Energy
C
Nigeria
World Bank
Last updated on 07/05/2015
Favorite this item
Etiqueta

Consultancy for the Preparation of a Strategic Environmental and Social Assessment (SESA) on Development of Gas-fired, Solar and Mini-hydro Power Generation Plants by Independent Power Producers (IPPs) in Nigeria

Project Electricity & Gas Improvement Project (NEGIP)
Date posted
Estado Closed
DB Reference No WB-P335534-05/15
Deadline (local time):
Imagen
Miscellaneous
C
Nigeria
World Bank
Last updated on 07/05/2015
Favorite this item
Etiqueta

Consultancy Services in Reform on Tax Administration in the State of OSUN

Project State and Local Governance Reform Project
Date posted
Estado Closed
DB Reference No WB-P335531-05/15
Deadline (local time):
Imagen
Energy
W
Mexico
World Bank
Last updated on 07/05/2015
Favorite this item
Etiqueta

Suministro de Planta Electrica Solar para la poblacion de Luis Echeverria Alvarez en el municipio de Mulege, en el estado de Baja California

Project Integrated Energy Services
Date posted
Estado Closed
DB Reference No WB-P335528-05/15
Deadline (local time):
Imagen
Miscellaneous
C
Mexico
World Bank
Last updated on 07/05/2015
Favorite this item
Etiqueta

Estudio de Sectorización del Área Operativa denominada Sector III, Etapa I, área de infraestructura del tanque remedios en diferentes colonias de Naucalpan, Edo. Mex.

Project Efficiency Improvement Program
Date posted
Estado Closed
DB Reference No WB-P335525-05/15
Deadline (local time):
Imagen
water, sanitation, and waste management icon
C
Mexico
World Bank
Last updated on 07/05/2015
Favorite this item
Etiqueta

Actualización del Catastro de Redes de Infraestructura de Agua Potable

Project UPDATE - Efficiency Improvement Program
Date posted
Estado Closed
DB Reference No WB-P335522-05/15
Deadline (local time):
Imagen
Energy
C
Chile
World Bank
Last updated on 06/05/2015
Favorite this item
Etiqueta

General Procurement Notice (GPN)

Project Chile-Partnership For Market Readiness, PMR
Date posted
Estado N/A
DB Reference No WB-P335444-05/15
Imagen
transportation
W
North Macedonia
World Bank
Last updated on 06/05/2015
Favorite this item
Etiqueta

Rehabilitation of Regional Roads 2 Lots

Project National and Regional Roads Rehabilitation Project
Date posted
Estado Closed
DB Reference No WB-P335441-05/15
Deadline (local time):
Imagen
Construction
Imagen
Social services
W
India
World Bank
Last updated on 06/05/2015
Favorite this item
Etiqueta

Rehabilitation and Upgrading to 2- lanes/2 - lane with Paved Shoulders Configuration and Strengthening of Fatuah-Harnaut-Barh Section (km0 to km69.6) of NH-30A in the State of Bihar under Phase-I of NHIIP

Project Phase I of National Highways Inter-Connectivity Improvement Projects (NHIIP)
Date posted
Estado Closed
DB Reference No WB-P335438-05/15
Deadline (local time):
Imagen
Miscellaneous
C
India
World Bank
Last updated on 06/05/2015
Favorite this item
Etiqueta

General Procurement Notice (GPN)

Project National Cyclone Risk Mitigation Project Phase-II (NCRMP-II)
Date posted
Estado N/A
DB Reference No WB-P335432-05/15
Imagen
Education
C
Regional - Latin America and The Caribbean
Caribbean Development Bank
Last updated on 06/05/2015
Favorite this item
Etiqueta

CONSULTANCY SERVICES TO PREPARE AN IMPLEMENTATION FRAMEWORK FOR THE SINGLE VIRTUAL UNIVERSITY SPACE AT THE UNIVERSITY OF THE WEST INDIES

Project UNIVERSITY OF THE WEST INDIES OPEN CAMPUS DEVELOPMENT PROJECT
Date posted
Estado Closed
DB Reference No CDB-P335519-05/15
Deadline (local time):
Imagen
Education
C
India
World Bank
Last updated on 06/05/2015
Favorite this item
Etiqueta

Selection of Consultancy Services for Script Writing & Training of the local performing artist group with handholding support on pilot basis

Project Bihar Panchayat Strengthening Project
Date posted
Estado Closed
DB Reference No WB-P335516-05/15
Deadline (local time):
Imagen
Medical
C
Central African Republic
World Bank
Last updated on 06/05/2015
Favorite this item
Etiqueta

Recrutement d'un Prestataire de Services devant Agir en Qualite d'agence de Verification Quantitative et Qualitative des Prestations Objet du Financement Base sur la Performance

Project Health System Support Project (FY12)
Date posted
Estado Closed
DB Reference No WB-P335513-05/15
Deadline (local time):
Imagen
Medical
W
Myanmar
United Nations Office for Project Services (UNOPS)
Last updated on 06/05/2015
Favorite this item
Etiqueta

Supply of Health Products under Round 9 grant of the Global Fund

Project UNOPS Myanmar
Date posted
Estado Closed
DB Reference No UN-P335510-05/15
Deadline (local time):
Imagen
Medical
G
Bangladesh
World Bank
Last updated on 06/05/2015
Favorite this item
Etiqueta

Procurement of Analyzer equipment

Project UPDATE - Health Sector Development Program
Date posted
Estado Closed
DB Reference No WB-P335507-05/15
Deadline (local time):
Imagen
Information
C
Brazil
United Nations Development Programme (UNDP)
Last updated on 06/05/2015
Favorite this item
Etiqueta

Consultancy Services on Information Technology - (ITB) Nº 28079/2015

Project <B>REVISED</B> - UNITED NATIONS DEVELOPMENT PROGRAMME
Date posted
Estado Closed
DB Reference No UN-P335504-05/15
Deadline (local time):
Imagen
Construction
Imagen
Social services
W
India
World Bank
Last updated on 06/05/2015
Favorite this item
Etiqueta

Rehabilitation and Upgrading to 2- lanes/2 - lane with Paved Shoulders Configuration and Strengthening of Birpur – Bihpur Section (km0 to km 106.0) of NH-106 in the State of Bihar under Phase-I of National Highways Inter-connectivity Improvement Projects

Project Phase I of National Highways Inter-Connectivity Improvement Projects (NHIIP)
Date posted
Estado Closed
DB Reference No WB-P335501-05/15
Deadline (local time):