Image
Site search
145014 results
Image
G
Brazil
World Bank
Last updated on 14/10/2024
Favorite this item
Libellé
Aquisição de alimentos para apoio às atividades de monitoramento de quelônios que ocorrerão durante quatro meses em Itamarati - AM (8 monitores atendidos).
Project
Amazon Sustainable Landscapes Project
Date de publication
État
Closed
DB Reference No
WB-P2144386-10/24
Deadline (local time):
Image
Image
G
Brazil
World Bank
Last updated on 14/10/2024
Favorite this item
Libellé
Aquisição de alimentos para atividades do evento de encerramento do período de monitoramento de quelônios com 600 participante que ocorrerá em Xibauá (data a definir novembro ou dezembro)
Project
Amazon Sustainable Landscapes Project
Date de publication
État
Closed
DB Reference No
WB-P2144388-10/24
Deadline (local time):
Image
Image
C
Honduras
Banco Centro Americano de Integración Económica
Last updated on 14/10/2024
Favorite this item
Libellé
CPI-SIT-BCIE-006-2024 Servicios de Consultoría para la Supervisión del Diseño y Construcción de la Ampliación y Mejoramiento de la Carretera El Progreso – Tela. Lote 1: El Progreso – Santiago: Km 8+400 al Km 38+600 CA - 13 (antes del Puente Santiago), y L
Project
CPI-SIT-BCIE-006-2024 Servicios de Consultoría para la Supervisión del Diseño y Construcción de la Ampliación y Mejoramiento de la Carretera El Progreso – Tela. Lote 1: El Progreso – Santiago: Km 8+400 al Km 38+600 CA - 13 (antes del Puente Santiago), y L
Date de publication
État
Open
DB Reference No
BCIE-P2144083-10/24
Deadline (local time):
Image
Image
C
Honduras
Banco Centro Americano de Integración Económica
Last updated on 14/10/2024
Favorite this item
Libellé
CPI-SIT-BCIE-007-2024 Servicios de Consultoría para la Supervisión del Diseño y Construcción de la Rehabilitación de la Carretera Tela – La Ceiba. Lote 1: Tela – Siempre Viva: 0+000 a 34+900 CA – 13, Lote 2: Siempre Viva – San Francisco: 34+900 a 61+400 C
Project
CPI-SIT-BCIE-007-2024 Servicios de Consultoría para la Supervisión del Diseño y Construcción de la Rehabilitación de la Carretera Tela – La Ceiba. Lote 1: Tela – Siempre Viva: 0+000 a 34+900 CA – 13, Lote 2: Siempre Viva – San Francisco: 34+900 a 61+400 C
Date de publication
État
Open
DB Reference No
BCIE-P2144084-10/24
Deadline (local time):
Image
Image
C
Honduras
Banco Centro Americano de Integración Económica
Last updated on 14/10/2024
Favorite this item
Libellé
CPI-SIT-BCIE-008-2024 Servicios de Consultoría para la Supervisión del Diseño y Mejoramiento de la Carretera Ojo de Agua – Cantarranas.
Project
CPI-SIT-BCIE-008-2024 Servicios de Consultoría para la Supervisión del Diseño y Mejoramiento de la Carretera Ojo de Agua – Cantarranas.
Date de publication
État
Open
DB Reference No
BCIE-P2144082-10/24
Deadline (local time):
Image
C
Pakistan
World Bank
Last updated on 11/10/2024
Favorite this item
Libellé
WBGeProcure: Support to Pakistan Institute of Education on NAT 2025 & Foundational Learning Study
Project
Support to Pakistan Institute of Education on NAT 2025 & Foundational Learning Study
Date de publication
État
Closed
DB Reference No
WB-P2144079-10/24
Deadline (local time):
Image
C
Pakistan
World Bank
Last updated on 11/10/2024
Favorite this item
Libellé
WBGeProcure: Support to Pakistan Institute of Education on Education Data Standardisation & Analysis
Project
Support to Pakistan Institute of Education on Education Data Standardisation & Analysis
Date de publication
État
Closed
DB Reference No
WB-P2144078-10/24
Deadline (local time):
Image
C
Saudi Arabia
World Bank
Last updated on 11/10/2024
Favorite this item
Libellé
WBGeProcure: Development of Manual on Compensation for Environmental Damage in Kingdom of Saudi Arabia
Project
Development of Manual on Compensation for Environmental Damage in Kingdom of Saudi Arabia
Date de publication
État
Closed
DB Reference No
WB-P2144077-10/24
Deadline (local time):
Image
C
Various
World Bank
Last updated on 11/10/2024
Favorite this item
Libellé
WBGeProcure: Capacity building for carbon market transactions
Project
Capacity building for carbon market transactions
Date de publication
État
Closed
DB Reference No
WB-P2144076-10/24
Deadline (local time):
Image
C
Benin,
Côte d’Ivoire
World Bank
Last updated on 11/10/2024
Favorite this item
Libellé
WBGeProcure: Design of an intervention to reduce inter-group prejudice in Benin and Côte d'Ivoire
Project
Design of an intervention to reduce inter-group prejudice in Benin and Côte d'Ivoire
Date de publication
État
Closed
DB Reference No
WB-P2144075-10/24
Deadline (local time):
Image
Image
C
Various
World Bank
Last updated on 11/10/2024
Favorite this item
Libellé
WBGeProcure: IFC DigiLab Data Implementation in Europe
Project
IFC DigiLab Data Implementation in Europe
Date de publication
État
Closed
DB Reference No
WB-P2144074-10/24
Deadline (local time):
Image
Image
C
Maldives,
Sri Lanka
World Bank
Last updated on 11/10/2024
Favorite this item
Libellé
WBGeProcure: World Bank Enterprise Surveys 2025 in Sri Lanka and the Maldives
Project
World Bank Enterprise Surveys 2025 in Sri Lanka and the Maldives
Date de publication
État
Closed
DB Reference No
WB-P2144073-10/24
Deadline (local time):
Image
C
Various
World Bank
Last updated on 11/10/2024
Favorite this item
Libellé
WBGeProcure: Development of Business Case Study for Field Epidemiology Training Program (FETP) India
Project
Development of Business Case Study for Field Epidemiology Training Program (FETP) India
Date de publication
État
Closed
DB Reference No
WB-P2144072-10/24
Deadline (local time):
Image
C
Kosovo
World Bank
Last updated on 11/10/2024
Favorite this item
Libellé
Kosovo SDP
Project
Kosovo SDP
Date de publication
État
Closed
DB Reference No
WB-P2144071-10/24
Deadline (local time):
Image
Image
C
Pakistan
World Bank
Last updated on 11/10/2024
Favorite this item
Libellé
WBGeProcure: PAKISTAN: Gap Analysis of Asset Management for Provincial Road Agencies
Project
PAKISTAN: Gap Analysis of Asset Management for Provincial Road Agencies
Date de publication
État
Closed
DB Reference No
WB-P2144070-10/24
Deadline (local time):
Image
Image
C
Kenya
World Bank
Last updated on 11/10/2024
Favorite this item
Libellé
WBGeProcure: White Paper on Enhancing Access to Financial Services for Farmers in Kenya
Project
White Paper on Enhancing Access to Financial Services for Farmers in Kenya
Date de publication
État
Closed
DB Reference No
WB-P2144069-10/24
Deadline (local time):
Image
Image
C
South Africa
World Bank
Last updated on 11/10/2024
Favorite this item
Libellé
WBGeProcure: Water Security Assessment of South Africa
Project
Water Security Assessment of South Africa
Date de publication
État
Closed
DB Reference No
WB-P2144068-10/24
Deadline (local time):
Image
C
Various
World Bank
Last updated on 11/10/2024
Favorite this item
Libellé
WBGeProcure: Evaluation of the IFC Green Bond Technical Assistance Program
Project
Evaluation of the IFC Green Bond Technical Assistance Program
Date de publication
État
Closed
DB Reference No
WB-P2144067-10/24
Deadline (local time):
Image
C
Guinea
African Development Bank
Last updated on 11/10/2024
Favorite this item
Libellé
Etude d’électrification de nouvelles localités
Project
Projet d’Amélioration de l’Accès à l’Electricité en Guinée (PAAEG)
Date de publication
État
Closed
DB Reference No
AfDB-P2144066-10/24
Deadline (local time):
Image
C
Guinea
African Development Bank
Last updated on 11/10/2024
Favorite this item
Libellé
L’Etude pour la réhabilitation et le renforcement du réseau HTA/BT du système Tinkisso (Dabola-Bissikirima-Dinguiraye et Dabola-Faranah)
Project
PROJET D’ETUDES PREPARATOIRES DE PROJETS DE PRODUCTION HYDROELECTRIQUE, ET D’ACCES A L’ELECTRICITE (PPF)
Date de publication
État
Closed
DB Reference No
AfDB-P2144065-10/24
Deadline (local time):