Image
Site search
144978 results
C
Lao People's Democratic Republic
World Bank
Last updated on 23/05/2013
Favorite this item
Libellé
Individual Consultants Services for PAW
Project
Protected Area and Wildlife Project
Date de publication
État
Closed
DB Reference No
WB-P437804-05/13
Deadline (local time):
Image
C
Madagascar
World Bank
Last updated on 23/05/2013
Favorite this item
Libellé
Recrutement Assistant Technique International REDD
Project
Projet d'Appui au Troisième Programme Environnemental (PE3)
Date de publication
État
Closed
DB Reference No
WB-P437801-05/13
Deadline (local time):
Image
W
Senegal
World Bank
Last updated on 23/05/2013
Favorite this item
Libellé
Travaux de drainage et d’aménagement urbain des bassins et voiries de la phase 1 (Secteur 1 [Dalifort] et Secteur 2 [Bagdad, Wakhinane])
Project
Projet de Gestion des Eaux Pluviales et d'Adaptation aux Changements Climatiques (PROGEP)
Date de publication
État
Closed
DB Reference No
WB-P437798-05/13
Deadline (local time):
Image
G
Bolivia
Inter-American Development Bank
Last updated on 23/05/2013
Favorite this item
Libellé
Suministro de Estructuras Metálicas Auto Soportadas
Project
Proyecto Línea de Transmisión Eléctrica 115 kV Yucumo – San Buenaventura
Date de publication
État
Closed
DB Reference No
IDB-P437795-05/13
Deadline (local time):
Image
G
Brazil
Inter-American Development Bank
Last updated on 23/05/2013
Favorite this item
Libellé
<B>2nd UPDATE</B> - Aquisição de aeronave tipo helicóptero biturbina, categoria leve com capacidade de transporte de 02 (dois) pilotos, em duplo comando e 06 (seis) passageiros.
Project
Programa de Recuperação Socioambiental da Serra do Mar e Sistema de Mosaicos da Mata Atlântica
Date de publication
État
Closed
DB Reference No
IDB-P437792-05/13
Deadline (local time):
Image
C
Albania
World Bank
Last updated on 23/05/2013
Favorite this item
Libellé
Advisory support to the MoF in preparing the functional and technical specifications for full packages of AFMIS and IPSIS solutions
Project
Capacity Building and Support to Implement the Integrated Planning System (IPS 2) in Albania
Date de publication
État
Closed
DB Reference No
WB-P437789-05/13
Deadline (local time):
Image
C
Palestine, State of
World Bank
Last updated on 23/05/2013
Favorite this item
Libellé
Data/Statistics Expert
Project
Government Services for Business Development Project
Date de publication
État
Closed
DB Reference No
WB-P437786-05/13
Deadline (local time):
Image
G
Myanmar
United Nations Office for Project Services (UNOPS)
Last updated on 23/05/2013
Favorite this item
Libellé
Supply of CD4 machine and other equipment
Project
United Nations Office for Project Services (UNOPS)
Date de publication
État
Closed
DB Reference No
UN-P437783-05/13
Deadline (local time):
Image
C
Vietnam
World Bank
Last updated on 23/05/2013
Favorite this item
Libellé
Water Quality Model - Optimizing Management of Reservoir Water Quality
Project
Trung Son Hydropower Project
Date de publication
État
Closed
DB Reference No
WB-P437780-05/13
Deadline (local time):
Image
C
Vietnam
World Bank
Last updated on 23/05/2013
Favorite this item
Libellé
<B>UPDATE</B> - Changes Monitoring and Guiding to Fish Breeding and Fishing
Project
<B>UPDATE</B> - Trung Son Hydropower Project
Date de publication
État
Closed
DB Reference No
WB-P437777-05/13
Deadline (local time):
Image
C
Brazil
World Bank
Last updated on 23/05/2013
Favorite this item
Libellé
Water Resources State Plan of the State of Goiás
Project
Federal Integrated Water Sector Project - INTERÁGUAS
Date de publication
État
Closed
DB Reference No
WB-P437774-05/13
Deadline (local time):
Image
C
South Sudan
World Bank
Last updated on 23/05/2013
Favorite this item
Libellé
Support to Water Supply PPPs in Kajo Keji and in Nimule, South Sudan
Project
AFRICA CORE MDTF
Date de publication
État
Closed
DB Reference No
WB-P437771-05/13
Deadline (local time):
Image
C
Nigeria
World Bank
Last updated on 23/05/2013
Favorite this item
Libellé
eConsult: Financial Infrastructure Consultant for Nigeria
Project
Financial Infrastructure in Sub Saharan Africa
Date de publication
État
Closed
DB Reference No
WB-P437768-05/13
Deadline (local time):
Image
G
Congo, Democratic Republic of
African Development Bank
Last updated on 22/05/2013
Favorite this item
Libellé
Fourniture des Equipements de Bureau aux profils des entités bénéficiaires et de l’UGP
Project
Projet d’Appui au Développement des Infrastructures Rurales (PADIR)
Date de publication
État
Closed
DB Reference No
AfDB-P437744-05/13
Deadline (local time):
Image
G
Congo, Democratic Republic of
African Development Bank
Last updated on 22/05/2013
Favorite this item
Libellé
Fourniture de matériels informatiques aux profils des Entités bénéficiaires et de l’UGP
Project
Projet d’Appui au Développement des Infrastructures Rurales (PADIR)
Date de publication
État
Closed
DB Reference No
AfDB-P437741-05/13
Deadline (local time):
Image
G
Congo, Democratic Republic of
African Development Bank
Last updated on 22/05/2013
Favorite this item
Libellé
Fourniture de matériels roulants aux profils des Entités bénéficiaires et de l’UGP
Project
Projet d’Appui au Développement des Infrastructures Rurales (PADIR)
Date de publication
État
Closed
DB Reference No
AfDB-P437738-05/13
Deadline (local time):
Image
C
Morocco
African Development Bank
Last updated on 22/05/2013
Favorite this item
Libellé
Modernisation du système d’irrigation du périmètre irrigué des Doukkala
Project
Projet d’Appui au Programme National d’Economie d’Eau d’Irrigation (PAPNEEI)
Date de publication
État
Closed
DB Reference No
AfDB-P437735-05/13
Deadline (local time):
Image
C
Congo, Democratic Republic of
World Bank
Last updated on 22/05/2013
Favorite this item
Libellé
Conception de l’organigramme du Service Geologique National et ses Antennes Provinciales en Republique Democratique du Congo (RDC)
Project
Projet de Bonne Gouvernance dans le Secteur Minier Comme Facteur de Croissance (PROMINES)
Date de publication
État
Closed
DB Reference No
WB-P437732-05/13
Deadline (local time):
Image
G
Congo, Democratic Republic of
World Bank
Last updated on 22/05/2013
Favorite this item
Libellé
Elaboration du Cahier des Charges, Canevas Geodesique pour le Renforcement du Reseau Geodesique de la RDC
Project
Projet de Bonne Gouvernance dans le Secteur Minier comme Facteur de Croissance (PROMINES)
Date de publication
État
Closed
DB Reference No
WB-P437729-05/13
Deadline (local time):
Image
G
Congo, Democratic Republic of
World Bank
Last updated on 22/05/2013
Favorite this item
Libellé
Acquisition de la Robinetterie et Dispositifs Anti-Fraude pour la Pose des Compteurs et Appropriation des Branchements Particuliers pour Kinshasa, Matadi Et Lubunbashi
Project
Urban Water Supply Project (FY09)
Date de publication
État
Closed
DB Reference No
WB-P437726-05/13
Deadline (local time):