Image
Site search
144163 results
W
Mauritania
African Development Bank
Last updated on 22/02/2013
Favorite this item
Libellé
Avis General de Passation de Marches: Projet National Intégré dans le Secteur de l’Eau en Milieu Rural (PNISER)
Project
Projet National Intégré dans le Secteur de l’Eau en Milieu Rural (PNISER)
Date de publication
État
N/A
DB Reference No
AfDB-P430733-02/13
Image
C
Gambia
African Development Bank
Last updated on 22/02/2013
Favorite this item
Libellé
<B>REVISED</B> - Gambia Health Market Study Consultant, OPSM.2
Project
Health Market Study
Date de publication
État
Closed
DB Reference No
AfDB-P430730-02/13
Deadline (local time):
Image
W
Djibouti
African Development Bank
Last updated on 22/02/2013
Favorite this item
Libellé
Avis General de Passation de Marches: Projet d’Approvisionnement en Eau Potable et d’Assainissement en Milieu Rural et des Centres Secondaires des Régions de Tadjourah, d’Arta et d’Ali Sabieh
Project
Projet d’Approvisionnement en Eau Potable et d’Assainissement en Milieu Ruralet des Centres Secondaires des Régions de Tadjourah, d’Arta et d’Ali Sabieh
Date de publication
État
N/A
DB Reference No
AfDB-P430727-02/13
Image
C
Burkina Faso
African Development Bank
Last updated on 22/02/2013
Favorite this item
Libellé
<B>UPDATE</B> - Réalisation de campagnes de sensibilisation à la protection de l’environnement, à la sécurité routière, aux Maladies Sexuellement Transmissibles (MST) et VIH/SIDA et au respect du règlement de l’UEMOA sur la charge à l’essieu
Project
Projet de Rehabilitation de Routes et de Facilitation du Transport sur le Corridor CU9 Lome – Ouagadougou
Date de publication
État
Closed
DB Reference No
AfDB-P430724-02/13
Deadline (local time):
Image
G
Nepal
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
Supply and Delivery of Cold Chain and Refrigeration Equipment
Project
Nepal Health Sector Program 2 (NHSP-2)
Date de publication
État
Closed
DB Reference No
WB-P430721-02/13
Deadline (local time):
Image
C
Rwanda
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
Consultant Service for an Individual Consultant to Conduct a Study on “Trends and Skills Needs for the Tourism Sector in Rwanda.”
Project
Governance for Competitiveness Technical Assistance (G4C TA) Project
Date de publication
État
Closed
DB Reference No
WB-P430718-02/13
Deadline (local time):
Image
Image
W
Vietnam
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
Upgrading, rehabilitaion of Bac channel, section 1
Project
Medium Cities Development Project
Date de publication
État
Closed
DB Reference No
WB-P430715-02/13
Deadline (local time):
Image
W
Slovak Republic
European Bank for Reconstruction and Development
Last updated on 22/02/2013
Favorite this item
Libellé
D3.3 'Dismantling of Electric Power Supply Systems'
Project
D3.3 'Dismantling of Electric Power Supply Systems'
Date de publication
État
Closed
DB Reference No
EBRD-P430712-02/13
Deadline (local time):
Image
Image
W
Congo, Democratic Republic of
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
Mission de Controle des Travaux de Rehabilitation et Modernisation des Axes des Routes Prioritaires des Six Villes Ciblees de la RDC dans le Cadre du Projet de Developpement Urbain.
Project
Urban Development Project
Date de publication
État
Closed
DB Reference No
WB-P430709-02/13
Deadline (local time):
Image
C
Peru
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
Apoyo Para La Implementación Del SIG
Project
Optimization of Lima Water & Sewerage Project
Date de publication
État
Closed
DB Reference No
WB-P430706-02/13
Deadline (local time):
Image
W
Peru
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
Estandarización de los Sistemas Scada de Sedapal
Project
Optimization of Lima Water & Sewerage Project
Date de publication
État
Closed
DB Reference No
WB-P430703-02/13
Deadline (local time):
Image
C
Various
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
e-Consult: Measuring the Cost of Trade Logistics on Agribusiness
Project
Trade Logistics Advisory Program
Date de publication
État
Closed
DB Reference No
WB-P430700-02/13
Deadline (local time):
Image
C
Various
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
e-Consult: Mid-Term Evaluation of the National Portfolio Formulation Exercise Short Term Consultant
Project
Mid-Term Evaluation of the National Portfolio Formulation Exercise Short Term Consultant
Date de publication
État
Closed
DB Reference No
WB-P430673-02/13
Deadline (local time):
Image
C
Brazil
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
Contratação de Consultoria Pessoa Jurídica para Elaboração do Plano de Manejo Espeleológico do Parque Estadual de Terra Ronca, Goiás, Brasil
Project
Projeto Cerrado Sustentável Goiás
Date de publication
État
Closed
DB Reference No
WB-P430670-02/13
Deadline (local time):
Image
C
Various
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
e-Consult: Mid-Term Evaluation of the National Portfolio Formulation Exercise Senior Consultant
Project
Mid-Term Evaluation of the National Portfolio Formulation Exercise Senior Consultant
Date de publication
État
Closed
DB Reference No
WB-P430667-02/13
Deadline (local time):
Image
C
Various
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
e-Consult: Mekong Private Sector Development Facility - END-OF-FACILITY REVIEW
Project
Regional Hub
Date de publication
État
Closed
DB Reference No
WB-P430664-02/13
Deadline (local time):
Image
C
Various
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
e-Consult: Procurement Specialist STC
Project
Procurement Specialist STC
Date de publication
État
Closed
DB Reference No
WB-P430661-02/13
Deadline (local time):
Image
C
Philippines
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
e-Consult: Renewable Energy Policy Implementation Support
Project
EAP Dutch - Renewable Energies
Date de publication
État
Closed
DB Reference No
WB-P430658-02/13
Deadline (local time):
Image
C
Saint Kitts and Nevis
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
e-Consult: Legal Reform in St Kitts and Nevis Port Operations
Project
Trade Logistics - Caribbean
Date de publication
État
Closed
DB Reference No
WB-P430697-02/13
Deadline (local time):
Image
Image
C
Croatia
World Bank
Last updated on 22/02/2013
Favorite this item
Libellé
Technical Supervision of reconstruction and construction works on the building of Back-Up/Disaster Recovery Center, Technical Supervision of reconstruction and construction works on the building of Back-Up/Disaster Recovery Center Tax Administration
Project
Revenue Administration Modernization Project
Date de publication
État
Closed
DB Reference No
WB-P430694-02/13
Deadline (local time):