Image
Site search
145313 results
Image
Image
C
Tanzania, United Republic of
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Package 5: Consulting Services to undertake Environmental and Social Impact Assessment (ESIA) for the Construction of Regional Land Offices in Simiyu, Mara, Mwanza, Kagera and Geita.
Project
Land Tenure Improvement Project
Date posted
Status
Closed
DB Reference No
WB-P1126348-01/23
Deadline (local time):
Image
Image
Image
C
Tanzania, United Republic of
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Package 1: Consulting Services to undertake Environmental and Social Impact Assessment (ESIA) for the Construction of Regional Land Offices in Dodoma, Manyara, Arusha, Kilimanjaro, Tanga and Archive Building in Dodoma.
Project
Land Tenure Improvement Project
Date posted
Status
Closed
DB Reference No
WB-P1126351-01/23
Deadline (local time):
Image
Image
Image
C
Tanzania, United Republic of
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Package 2: Consulting Services to undertake Environmental and Social Impact Assessment (ESIA) for the Construction of Regional Land Offices in Iringa, Njombe, Mbeya, Rukwa and Songwe.
Project
Land Tenure Improvement Project
Date posted
Status
Closed
DB Reference No
WB-P1126360-01/23
Deadline (local time):
Image
Image
W
Pakistan
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Construction and Rehabilitation of Schools at District Chaghi, Civil Works Package 03
Project
Balochistan Human Capital Investment Project
Date posted
Status
Closed
DB Reference No
WB-P1126387-01/23
Deadline (local time):
Image
Image
W
Pakistan
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Construction and Rehabilitation of Schools at District Chaghi, Civil Works Package 01
Project
Balochistan Human Capital Investment Project
Date posted
Status
Closed
DB Reference No
WB-P1126294-01/23
Deadline (local time):
Image
Image
W
India
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Balance works of IRR-01/Lot-3, in Right Bank Main Canal (RBMC) from 79.92Km to 85.31Km including all its appurtenant canals within the reach, comprising of two lots.
Project
West Bengal Major Irrigation and Flood Management Project
Date posted
Status
Closed
DB Reference No
WB-P1126297-01/23
Deadline (local time):
Image
Image
W
India
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Balance works of IRR-01/Lot-1, in Right Bank Main Canal (RBMC) from 50.84 Km to 66.52Km including all its appurtenant canals within the reach, comprising of two lots.
Project
West Bengal Major Irrigation and Flood Management Project
Date posted
Status
Closed
DB Reference No
WB-P1126291-01/23
Deadline (local time):
Image
Image
W
Egypt
European Bank for Reconstruction and Development
Last updated on 16/01/2023
Favorite this item
Title
PP3.7 A. Reconstruction Of Bridges At The Following Drains Outlet: Umm Tahoun, Arbaeen, And Al Suyah Public Drain. B. Implementation Of A Trash Rach And Aquatic Weed Barrier System (Netaq) At 0.3 Km On The Hafir Shehabuddin Drain
Project
Kitchener Drain Depollution - Drain Rehabilitation
Date posted
Status
Closed
DB Reference No
EBRD-P1126585-01/23
Deadline (local time):
Image
W
Sierra Leone
World Bank
Last updated on 16/01/2023
Favorite this item
Title
CONSTRUCTION OF 1592m2 SPACED VIEWING DECKS, CANOPIES, A FOOD SHOP AND TOILET BLOCK WITH 0.165 KM OF CONCRETE RIGID PAVEMENT ROAD REHABILITATION WITH 36 PARKING BAYS AT LEICESTER PEAK
Project
Sierra Leone Economic Diversification Project
Date posted
Status
Closed
DB Reference No
WB-P1126267-01/23
Deadline (local time):
Image
Image
W
Madagascar
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Travaux de renforcement et de sécurisation de la salle du serveur
Project
Madagascar Basic Education Support Project
Date posted
Status
Closed
DB Reference No
WB-P1126270-01/23
Deadline (local time):
Image
Image
G
Guinea
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Acquisition et déploiement le Système d’Information et de Gestion « SIG » mutualisé au sein des les institutions de Microfinance « IMF » en Guinée et transfert de compétence.
Project
Support to MSME Growth Competitiveness and Access to Finance
Date posted
Status
Closed
DB Reference No
WB-P1126273-01/23
Deadline (local time):
Image
Image
G
Guinea
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Acquisition, installation et configuration du matériel informatique devant héberger le système d’information et de Gestion « SIG » mutualisé pour les institutions de Microfinance « IMF » en Guinée
Project
Support to MSME Growth Competitiveness and Access to Finance
Date posted
Status
Closed
DB Reference No
WB-P1126264-01/23
Deadline (local time):
Image
Image
C
Angola
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Especialista em Salvaguardas Sociais e Ambientais
Project
Angola Strengthening Statistical Capacity
Date posted
Status
Closed
DB Reference No
WB-P1126231-01/23
Deadline (local time):
Image
C
Azerbaijan
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Technical Assistance to Develop Road Network Management Systems, User Charging Models and Systems to Prevent Over-loaded Axles
Project
Regional Connectivity and Development Project
Date posted
Status
Closed
DB Reference No
WB-P1126213-01/23
Deadline (local time):
Image
C
Ethiopia
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Individual Consultancy Service of Traffic Engineer
Project
Ethiopia: Transport Systems Improvement Project (TRANSIP)
Date posted
Status
Closed
DB Reference No
WB-P1126219-01/23
Deadline (local time):
Image
C
Dominica
World Bank
Last updated on 16/01/2023
Favorite this item
Title
System Study of Digital Strategy, Standards, Business Continuity and protocols, SSO and BPR of Citizen Facing Services, Electronic entry, HMIS, SMARTSTREAM, e-Office/DMS, Bulk Digitization and National Web Portal and Mobile Portal
Project
Caribbean Digital Transformation Project
Date posted
Status
Closed
DB Reference No
WB-P1126222-01/23
Deadline (local time):
Image
Image
C
Azerbaijan
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Improving Access to Justice and Legal Awareness - strategic communications and outreach
Project
Judicial Services and Smart Infrastructure Project
Date posted
Status
Closed
DB Reference No
WB-P1126225-01/23
Deadline (local time):
Image
C
Congo, Democratic Republic of
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Recrutement d'un Consultant en charge de rédiger le cadre règlementaire de simplification des mesures de vigilance relatives à la clientèle
Project
Empowering Women Entrepreneurs and Upgrading MSMEs for Economic Transformation and Jobs in DRC Proje
Date posted
Status
Closed
DB Reference No
WB-P1126228-01/23
Deadline (local time):
Image
C
Congo, Democratic Republic of
World Bank
Last updated on 16/01/2023
Favorite this item
Title
Consultant en charge de développer des manuels de procédures pour la BCC pour la supervision de la LBC/FT basée sur le risque d'organiser la diffusion de guides opérationnels, de développer et mettre en œuvre des actions/modules de formation
Project
Empowering Women Entrepreneurs and Upgrading MSMEs for Economic Transformation and Jobs in DRC Proje
Date posted
Status
Closed
DB Reference No
WB-P1126234-01/23
Deadline (local time):
Image
G
Burkina Faso
World Bank
Last updated on 16/01/2023
Favorite this item
Title
UPDATE- Equipement d'une Ecole Normale Supérieure de Formation des Enseignants en Sciences et du Lycée Scientifique d'application
Project
Education Access and Quality Improvement Project (EAQIP)
Date posted
Status
Closed
DB Reference No
WB-P1126249-01/23
Deadline (local time):