图像
Site search
145392 results
C
Brazil
World Bank
Last updated on 03/01/2023
Favorite this item
标签
eConsult: Smart Metrorail Development in Brazil Ancillary Revenue for the Belo Horizonte Metropolitan Transport System
Project
Smart Metrorail Development in Brazil Ancillary Revenue for the Belo Horizonte Metropolitan Transport System
发布日期
状态
Closed
DB Reference No
WB-P1123225-01/23
Deadline (local time):
图像
C
China
World Bank
Last updated on 03/01/2023
Favorite this item
标签
eConsult: Analysis on Power Systems with High Proportion of Renewable Energy and with Energy Storage and Hydrogen Energy Applications
Project
Analysis on Power Systems with High Proportion of Renewable Energy and with Energy Storage and Hydrogen Energy Applications
发布日期
状态
Closed
DB Reference No
WB-P1123222-01/23
Deadline (local time):
图像
C
Chad
African Development Bank
Last updated on 03/01/2023
Favorite this item
标签
CONSULTANT INDIVIDUEL EN SUIVI EVALUATION DU PAGESE
Project
PROJET D’APPUI À LA GOUVERNANCE ÉCONOMIQUE ET AU SECTEUR EXTRACTIF (PAGESE)
发布日期
状态
Closed
DB Reference No
AfDB-P1123219-01/23
Deadline (local time):
图像
C
Nigeria
World Bank
Last updated on 03/01/2023
Favorite this item
标签
eConsult: INTEGRATION STUDIES OF PV SOLAR POWER INTO THE NIGERIAN NATIONAL GRID
Project
INTEGRATION STUDIES OF PV SOLAR POWER INTO THE NIGERIAN NATIONAL GRID
发布日期
状态
Closed
DB Reference No
WB-P1123216-01/23
Deadline (local time):
图像
C
China
World Bank
Last updated on 03/01/2023
Favorite this item
标签
eConsult: Energy Storage and Green Hydrogen Development in Major Countries
Project
Energy Storage and Green Hydrogen Development in Major Countries
发布日期
状态
Closed
DB Reference No
WB-P1123213-01/23
Deadline (local time):
图像
C
Ecuador
World Bank
Last updated on 03/01/2023
Favorite this item
标签
eConsult: Technical Assistance for Sustainable Ocean Management in Galapagos
Project
Technical Assistance for Sustainable Ocean Management in Galapagos
发布日期
状态
Closed
DB Reference No
WB-P1123153-01/23
Deadline (local time):
图像
C
Ecuador
World Bank
Last updated on 03/01/2023
Favorite this item
标签
eConsult: Technical Assistance for Sustainable Ocean Management in the Continental Coastline
Project
Technical Assistance for Sustainable Ocean Management in the Continental Coastline
发布日期
状态
Closed
DB Reference No
WB-P1123150-01/23
Deadline (local time):
图像
图像
C
Niger
African Development Bank
Last updated on 03/01/2023
Favorite this item
标签
L’AUDIT DE PERFORMANCE ENVIRONNEMENTALE ET SOCIALE DU PROGRAMME KANDADJI AU TITRE DES ANNEES 2021, 2022, 2023.
Project
ROJET D’APPUI AU PROGRAMME « KANDADJI » DE REGENERATION DES ECOSYSTEMES ET DE MISE EN VALEUR DE LA VALLEE DU NIGER
发布日期
状态
Closed
DB Reference No
AfDB-P1123138-01/23
Deadline (local time):
图像
C
South Sudan,
Somalia,
Kenya,
Ethiopia,
Djibouti
World Bank
Last updated on 03/01/2023
Favorite this item
标签
eConsult: Refugee Employment Advancement Program (REAP): Outcome-based Funding Model
Project
Refugee Employment Advancement Program (REAP): Outcome-based Funding Model
发布日期
状态
Closed
DB Reference No
WB-P1123135-01/23
Deadline (local time):
图像
图像
C
Chad
African Development Bank
Last updated on 03/01/2023
Favorite this item
标签
SPECIALISTE NATIONAL EN PASSATION DES MARCHES (SNPM) DU PAGESE
Project
PROJET D’APPUI À LA GOUVERNANCE ÉCONOMIQUE ET AU SECTEUR EXTRACTIF (PAGESE)
发布日期
状态
Closed
DB Reference No
AfDB-P1123132-01/23
Deadline (local time):
图像
图像
C
Regional - South Asia
World Bank
Last updated on 03/01/2023
Favorite this item
标签
eConsult: Southeast Asia Disaster Risk Insurance Facility (SEADRIF) - Strengthening Financial Resilience in ASEAN+3 Region: Development of the Fundamentals of Insurance for the Public Sector Training Program
Project
Southeast Asia Disaster Risk Insurance Facility (SEADRIF) - Strengthening Financial Resilience in ASEAN+3 Region: Development of the Fundamentals of Insurance for the Public Sector Training Program
发布日期
状态
Closed
DB Reference No
WB-P1123129-01/23
Deadline (local time):
图像
C
Colombia
Inter-American Development Bank
Last updated on 03/01/2023
Favorite this item
标签
Aviso de Manifestación de Interés - PAMD-156-CF-SBCC-22
Project
Construir una propuesta integral de política pública nacional de cultura de la contribución”.
发布日期
状态
Closed
DB Reference No
IDB-P1123063-01/23
Deadline (local time):
图像
G
Argentina
Government Organization
Last updated on 02/01/2023
Favorite this item
标签
Adquisición de un Sistema de Tomografía por Emisión de Fotón Simple con Tomógrafo Computarizado
Project
Hospital de Alta Complejidad en Red El Cruce Dr. Néstor Carlos Kirchner S.A.M.I.C.
发布日期
状态
Closed
DB Reference No
GN-P1123069-01/23
Deadline (local time):
图像
C
Bolivia
Inter-American Development Bank
Last updated on 30/12/2022
Favorite this item
标签
UPDATE- ESTUDIOS DE DISEÑO TECNICO DE PREINVERSION PARA PROYECTOS DE RIEGO
Project
Programa Nacional de Riego con Enfoque de Cuenca III (PRONAREC III),
发布日期
状态
Closed
DB Reference No
IDB-P1119109-12/22
Deadline (local time):
图像
Vietnam
Asian Development Bank
Last updated on 30/12/2022
Favorite this item
标签
Randomized Control Trial study
Project
TA-9660 REG: Promoting Transformative Gender Equality Agenda in Asia and the Pacific - Randomized Control Trial study
发布日期
状态
Closed
DB Reference No
ADB-P1122931-12/22
Deadline (local time):
图像
G
Argentina
World Bank
Last updated on 30/12/2022
Favorite this item
标签
UPDATE- Sistema Inteligente de Monitoreo para la Prevención y Análisis del Riesgo Hidrometeorológico (SIMPARH), Fase I – Etapa 1: Región Global del Río Salado.
Project
Salado Integrated River Basin Management Support Project
发布日期
状态
Closed
DB Reference No
WB-P1067499-09/22
Deadline (local time):
图像
图像
C
Burundi
World Bank
Last updated on 30/12/2022
Favorite this item
标签
Recrutement d'un ingénieur
Project
Burundi Transport Resilience Project
发布日期
状态
Closed
DB Reference No
WB-P1122853-12/22
Deadline (local time):
图像
G
Tajikistan
World Bank
Last updated on 30/12/2022
Favorite this item
标签
Procurement of tractors and agricultural equipment for State Unitary Republican Enterprise “Tojikniholparvar” and seed production farms
Project
Strengthening Resilience of the Agriculture Sector Project
发布日期
状态
Closed
DB Reference No
WB-P1122814-12/22
Deadline (local time):
图像
C
Uzbekistan
World Bank
Last updated on 30/12/2022
Favorite this item
标签
Technical support in bid evaluation and contract award for ERP
Project
Modernization and Upgrade of Transmission Substations
发布日期
状态
Closed
DB Reference No
WB-P1122835-12/22
Deadline (local time):
图像
C
Brazil
World Bank
Last updated on 30/12/2022
Favorite this item
标签
Estudo da infraestrutura do abastecimento de combustiveis que subsidiem o Ministerio de Minas e Energia no planejamento energético nacional no medio e longo prazos.
Project
Energy and Mineral Sectors Strengthening Project II
发布日期
状态
Closed
DB Reference No
WB-P1122847-12/22
Deadline (local time):