图像
Site search
145162 results
图像
C
Congo, Republic of
World Bank
Last updated on 04/09/2024
Favorite this item
标签
WBGeProcure: Nature-Based Solutions and Low Carbon Development to Strengthen Urban Resilience - Republic of Congo
Project
Nature-Based Solutions and Low Carbon Development to Strengthen Urban Resilience - Republic of Congo
发布日期
状态
Closed
DB Reference No
WB-P2136707-09/24
Deadline (local time):
图像
C
Various
World Bank
Last updated on 04/09/2024
Favorite this item
标签
WBGeProcure: BiH quantitative survey to study female labor force participation barriers and determinants
Project
BiH quantitative survey to study female labor force participation barriers and determinants
发布日期
状态
Closed
DB Reference No
WB-P2136706-09/24
Deadline (local time):
图像
图像
C
Philippines
World Bank
Last updated on 04/09/2024
Favorite this item
标签
WBGeProcure: Development of technical standards and roadmap for Recycled Content Standards for Plastics in PHL
Project
Development of technical standards and roadmap for Recycled Content Standards for Plastics in PHL
发布日期
状态
Closed
DB Reference No
WB-P2136705-09/24
Deadline (local time):
图像
C
Sri Lanka
World Bank
Last updated on 04/09/2024
Favorite this item
标签
WBGeProcure : Producing, Storing, Supplying, and/or Exporting Green Fuels in Sri Lanka’s Ports
Project
SL - Producing, Storing, Supplying, and/or Exporting Green Fuels in Sri Lanka’s Ports
发布日期
状态
Closed
DB Reference No
WB-P2136704-09/24
Deadline (local time):
图像
C
Various
World Bank
Last updated on 04/09/2024
Favorite this item
标签
WBGeProcure: RMI Conducting a comprehensive mapping of dietary intakes and development of dietary recommendations
Project
RMI Conducting a comprehensive mapping of dietary intakes and development of dietary recommendations
发布日期
状态
Closed
DB Reference No
WB-P2136703-09/24
Deadline (local time):
图像
图像
图像
G
Cameroon
World Bank
Last updated on 04/09/2024
Favorite this item
标签
Acquisition du matériel informatique et fournitures pour les structures VBG partenaires en convention avec le Projet
Project
Valorization of Investments in the Valley of the Benue
发布日期
状态
Closed
DB Reference No
WB-P2136640-09/24
Deadline (local time):
图像
G
Guatemala
United Nations Development Programme (UNDP)
Last updated on 04/09/2024
Favorite this item
标签
Suministro, instalación e implementación del Sistema de Parquímetros Inteligentes (SPI) para la Ciudad de Guatemala
Project
United Nations Development Programme
发布日期
状态
Closed
DB Reference No
UN-P2136702-09/24
Deadline (local time):
图像
图像
W
Niger
World Bank
Last updated on 04/09/2024
Favorite this item
标签
Construction de la Direction Générale des Services Vétérinaires (DGSV)
Project
Regional Sahel Pastoralism Support Project II
发布日期
状态
Closed
DB Reference No
WB-P2136641-09/24
Deadline (local time):
图像
图像
W
India
World Bank
Last updated on 04/09/2024
Favorite this item
标签
Construction of Drainage Line Treatment, Primary Water Harvesting & Secondary storage Structure in GPs Matuli & Dhakrayana . It involves multiple contracts open approach is adopted as the perspective bidders are available at different locations.
Project
Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态
Closed
DB Reference No
WB-P2136639-09/24
Deadline (local time):
图像
图像
W
India
World Bank
Last updated on 04/09/2024
Favorite this item
标签
Construction of Drainage Line Treatment, Primary Water Harvesting & Secondary storage Structure in Gram Panchayat Goela and Manlogkala. It involves multiple contracts open approach is adopted as the perspective bidders are available at different location
Project
Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态
Closed
DB Reference No
WB-P2136645-09/24
Deadline (local time):
图像
图像
图像
W
Marshall Islands
World Bank
Last updated on 04/09/2024
Favorite this item
标签
Construction of Government Resilient Facility Building
Project
Republic of the Marshall Islands Urban Resilience Project
发布日期
状态
Closed
DB Reference No
WB-P2136646-09/24
Deadline (local time):
图像
图像
W
India
World Bank
Last updated on 04/09/2024
Favorite this item
标签
Construction of Drainage Line Treatment, Primary Water Harvesting and Secondary storage Structure in Gram Panchayat Chamdar & Nalka .It involves multiple contracts open approach is adopted as the perspective bidders are available at different location.
Project
Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态
Closed
DB Reference No
WB-P2136638-09/24
Deadline (local time):
图像
图像
W
India
World Bank
Last updated on 04/09/2024
Favorite this item
标签
Construction of Drainage Line Treatment, Primary Water Harvesting and Secondary storage Structure in GPs Badhokhari and Diggle. It involves multiple contracts open approach is adopted as the perspective bidders are available at different locations
Project
Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态
Closed
DB Reference No
WB-P2136648-09/24
Deadline (local time):
图像
图像
G
Rwanda
World Bank
Last updated on 04/09/2024
Favorite this item
标签
Supply of mushroom tubes and installation of mushroom growing houses
Project
SECOND SUSTAINABLE AGRICULTURAL INTENSIFICATION AND FOOD SECURITY PROJECT
发布日期
状态
Closed
DB Reference No
WB-P2136650-09/24
Deadline (local time):
图像
图像
W
India
World Bank
Last updated on 04/09/2024
Favorite this item
标签
Construction of Drainage Line Treatment, Primary Water Harvesting and Secondary storage Structure in GPs Jhaja, Skori & Bhajani .It involves multiple contracts open approach is adopted as the perspective bidders are available at different locations.
Project
Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态
Closed
DB Reference No
WB-P2136651-09/24
Deadline (local time):
图像
图像
W
India
World Bank
Last updated on 04/09/2024
Favorite this item
标签
Construction of Drainage Line Treatment, Primary Water Harvesting and Secondary storage Structure in GPs Chhyachi,& Garsi. It involves multiple contracts open approach is adopted as the perspective bidders are available at different locations.
Project
Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态
Closed
DB Reference No
WB-P2136653-09/24
Deadline (local time):
图像
图像
G
Nigeria
World Bank
Last updated on 04/09/2024
Favorite this item
标签
Supply and installation of Meter Data Management System (MDMS) to Eleven Distribution Companies
Project
Nigeria Distribution Sector Recovery Program
发布日期
状态
Closed
DB Reference No
WB-P2136655-09/24
Deadline (local time):
图像
图像
G
Madagascar
World Bank
Last updated on 04/09/2024
Favorite this item
标签
Fourniture de pièces de rechange pour la centrale Hydraulique ANDEKALEKALot N°01 : 01 Transformateur de Puissance 41MVA 13,8KV/138 KV et accessoires - Lot N°02 : 05 Disjoncteurs HT Lot N°03: Appareils de mesure et équipements d'automatisme
Project
Digital and Energy Connectivity for Inclusion in Madagascar Project
发布日期
状态
Closed
DB Reference No
WB-P2136656-09/24
Deadline (local time):
图像
图像
W
Kyrgyzstan
World Bank
Last updated on 04/09/2024
Favorite this item
标签
Construction of kindergarten for 90 children on Orto-Don street in Tailan viilage of Razzakov city
Project
Second Regional Economic Development Project
发布日期
状态
Closed
DB Reference No
WB-P2136657-09/24
Deadline (local time):
图像
图像
C
Maldives
Islamic Development Bank
Last updated on 04/09/2024
Favorite this item
标签
Consultancy firm to conduct a Market Assessment covering comprehensive analysis and recommendations as per the scope and deliverables
Project
Support People's Livelihoods in the Fishery Sector in Maldives through Sustainable Energy Project
发布日期
状态
Closed
DB Reference No
IsDB-P2136419-09/24
Deadline (local time):