Site search

145162 results

图像
Environment
图像
Rural
C
Congo, Republic of
World Bank
Last updated on 04/09/2024
Favorite this item
标签

WBGeProcure: Nature-Based Solutions and Low Carbon Development to Strengthen Urban Resilience - Republic of Congo

Project Nature-Based Solutions and Low Carbon Development to Strengthen Urban Resilience - Republic of Congo
发布日期
状态 Closed
DB Reference No WB-P2136707-09/24
Deadline (local time):
图像
Social services
C
Various
World Bank
Last updated on 04/09/2024
Favorite this item
标签

WBGeProcure: BiH quantitative survey to study female labor force participation barriers and determinants

Project BiH quantitative survey to study female labor force participation barriers and determinants
发布日期
状态 Closed
DB Reference No WB-P2136706-09/24
Deadline (local time):
图像
Industry
图像
water, sanitation, and waste management icon
C
Philippines
World Bank
Last updated on 04/09/2024
Favorite this item
标签

WBGeProcure: Development of technical standards and roadmap for Recycled Content Standards for Plastics in PHL

Project Development of technical standards and roadmap for Recycled Content Standards for Plastics in PHL
发布日期
状态 Closed
DB Reference No WB-P2136705-09/24
Deadline (local time):
图像
transportation
C
Sri Lanka
World Bank
Last updated on 04/09/2024
Favorite this item
标签

WBGeProcure : Producing, Storing, Supplying, and/or Exporting Green Fuels in Sri Lanka’s Ports

Project SL - Producing, Storing, Supplying, and/or Exporting Green Fuels in Sri Lanka’s Ports
发布日期
状态 Closed
DB Reference No WB-P2136704-09/24
Deadline (local time):
图像
Medical
C
Various
World Bank
Last updated on 04/09/2024
Favorite this item
标签

WBGeProcure: RMI Conducting a comprehensive mapping of dietary intakes and development of dietary recommendations

Project RMI Conducting a comprehensive mapping of dietary intakes and development of dietary recommendations
发布日期
状态 Closed
DB Reference No WB-P2136703-09/24
Deadline (local time):
图像
agriculture
图像
Industry
图像
water, sanitation, and waste management icon
G
Cameroon
World Bank
Last updated on 04/09/2024
Favorite this item
标签

Acquisition du matériel informatique et fournitures pour les structures VBG partenaires en convention avec le Projet

Project Valorization of Investments in the Valley of the Benue
发布日期
状态 Closed
DB Reference No WB-P2136640-09/24
Deadline (local time):
图像
Rural
G
Guatemala
United Nations Development Programme (UNDP)
Last updated on 04/09/2024
Favorite this item
标签

Suministro, instalación e implementación del Sistema de Parquímetros Inteligentes (SPI) para la Ciudad de Guatemala

Project United Nations Development Programme
发布日期
状态 Closed
DB Reference No UN-P2136702-09/24
Deadline (local time):
图像
Construction
图像
Social services
W
Niger
World Bank
Last updated on 04/09/2024
Favorite this item
标签

Construction de la Direction Générale des Services Vétérinaires (DGSV)

Project Regional Sahel Pastoralism Support Project II
发布日期
状态 Closed
DB Reference No WB-P2136641-09/24
Deadline (local time):
图像
agriculture
图像
water, sanitation, and waste management icon
W
India
World Bank
Last updated on 04/09/2024
Favorite this item
标签

Construction of Drainage Line Treatment, Primary Water Harvesting & Secondary storage Structure in GPs Matuli & Dhakrayana . It involves multiple contracts open approach is adopted as the perspective bidders are available at different locations.

Project Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态 Closed
DB Reference No WB-P2136639-09/24
Deadline (local time):
图像
agriculture
图像
water, sanitation, and waste management icon
W
India
World Bank
Last updated on 04/09/2024
Favorite this item
标签

Construction of Drainage Line Treatment, Primary Water Harvesting & Secondary storage Structure in Gram Panchayat Goela and Manlogkala. It involves multiple contracts open approach is adopted as the perspective bidders are available at different location

Project Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态 Closed
DB Reference No WB-P2136645-09/24
Deadline (local time):
图像
Construction
图像
Finance
图像
Public Sector
W
Marshall Islands
World Bank
Last updated on 04/09/2024
Favorite this item
标签

Construction of Government Resilient Facility Building

Project Republic of the Marshall Islands Urban Resilience Project
发布日期
状态 Closed
DB Reference No WB-P2136646-09/24
Deadline (local time):
图像
agriculture
图像
water, sanitation, and waste management icon
W
India
World Bank
Last updated on 04/09/2024
Favorite this item
标签

Construction of Drainage Line Treatment, Primary Water Harvesting and Secondary storage Structure in Gram Panchayat Chamdar & Nalka .It involves multiple contracts open approach is adopted as the perspective bidders are available at different location.

Project Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态 Closed
DB Reference No WB-P2136638-09/24
Deadline (local time):
图像
agriculture
图像
water, sanitation, and waste management icon
W
India
World Bank
Last updated on 04/09/2024
Favorite this item
标签

Construction of Drainage Line Treatment, Primary Water Harvesting and Secondary storage Structure in GPs Badhokhari and Diggle. It involves multiple contracts open approach is adopted as the perspective bidders are available at different locations

Project Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态 Closed
DB Reference No WB-P2136648-09/24
Deadline (local time):
图像
agriculture
图像
Industry
G
Rwanda
World Bank
Last updated on 04/09/2024
Favorite this item
标签

Supply of mushroom tubes and installation of mushroom growing houses

Project SECOND SUSTAINABLE AGRICULTURAL INTENSIFICATION AND FOOD SECURITY PROJECT
发布日期
状态 Closed
DB Reference No WB-P2136650-09/24
Deadline (local time):
图像
Construction
图像
water, sanitation, and waste management icon
W
India
World Bank
Last updated on 04/09/2024
Favorite this item
标签

Construction of Drainage Line Treatment, Primary Water Harvesting and Secondary storage Structure in GPs Jhaja, Skori & Bhajani .It involves multiple contracts open approach is adopted as the perspective bidders are available at different locations.

Project Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态 Closed
DB Reference No WB-P2136651-09/24
Deadline (local time):
图像
Construction
图像
water, sanitation, and waste management icon
W
India
World Bank
Last updated on 04/09/2024
Favorite this item
标签

Construction of Drainage Line Treatment, Primary Water Harvesting and Secondary storage Structure in GPs Chhyachi,& Garsi. It involves multiple contracts open approach is adopted as the perspective bidders are available at different locations.

Project Integrated Project for Source Sustainability and Climate Resilient Rain-fed Agriculture in Himachal
发布日期
状态 Closed
DB Reference No WB-P2136653-09/24
Deadline (local time):
图像
Industry
图像
Information
G
Nigeria
World Bank
Last updated on 04/09/2024
Favorite this item
标签

Supply and installation of Meter Data Management System (MDMS) to Eleven Distribution Companies

Project Nigeria Distribution Sector Recovery Program
发布日期
状态 Closed
DB Reference No WB-P2136655-09/24
Deadline (local time):
图像
Energy
图像
Information
G
Madagascar
World Bank
Last updated on 04/09/2024
Favorite this item
标签

Fourniture de pièces de rechange pour la centrale Hydraulique ANDEKALEKALot N°01 : 01 Transformateur de Puissance 41MVA 13,8KV/138 KV et accessoires - Lot N°02 : 05 Disjoncteurs HT Lot N°03: Appareils de mesure et équipements d'automatisme

Project Digital and Energy Connectivity for Inclusion in Madagascar Project
发布日期
状态 Closed
DB Reference No WB-P2136656-09/24
Deadline (local time):
图像
Construction
图像
Finance
W
Kyrgyzstan
World Bank
Last updated on 04/09/2024
Favorite this item
标签

Construction of kindergarten for 90 children on Orto-Don street in Tailan viilage of Razzakov city

Project Second Regional Economic Development Project
发布日期
状态 Closed
DB Reference No WB-P2136657-09/24
Deadline (local time):
图像
agriculture
图像
Finance
C
Maldives
Islamic Development Bank
Last updated on 04/09/2024
Favorite this item
标签

Consultancy firm to conduct a Market Assessment covering comprehensive analysis and recommendations as per the scope and deliverables

Project Support People's Livelihoods in the Fishery Sector in Maldives through Sustainable Energy Project
发布日期
状态 Closed
DB Reference No IsDB-P2136419-09/24
Deadline (local time):