图像
Site search
144925 results
W
Bangladesh
Asian Development Bank
Last updated on 19/03/2015
Favorite this item
标签
Construction of (i) Earthen Dam (ii) Outlet Structure WRS, (iii) North Spilway , (iv) South Spilway , (v) WRS (5V-1.5mx1.8m), (vi) Bank Protection work, (viii) Irrigation Canal, (ix) WMCA Office including Rain Water Harvesting, Electrification, Supply of
Project
Participatory Small Scale Water Resources Sector Project
发布日期
状态
Closed
DB Reference No
ADB-P331385-03/15
Deadline (local time):
图像
W
India
Asian Development Bank
Last updated on 19/03/2015
Favorite this item
标签
Construction of Greenfield Six- Lane Extradosed Cable Bridge over riverGanga near Kachchi Dargah in District Patna on NH-30 to near Bidupur inDistrict Vaishali on NH-103, (Bihar). Length of the project 22.76 Km includes9.76 Km long main bridge
Project
<B>DEADLINE EXTENSION</B> - Bihar New Ganga Bridge Project
发布日期
状态
Closed
DB Reference No
ADB-P331382-03/15
Deadline (local time):
图像
G
Togo
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Fourniture d'Equipements de Transformation d'Ananas et Autres Fruits en Jus de Fruits
Project
Projet d'Appui au Secteur Agricole (PASA)
发布日期
状态
Closed
DB Reference No
WB-P331379-03/15
Deadline (local time):
图像
Togo
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Acquisition de Filets de Pêche et de Bobines
Project
Projet d'Appui au Secteur Agricole (PASA)
发布日期
状态
Closed
DB Reference No
WB-P331376-03/15
Deadline (local time):
图像
W
Togo
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Construction Cloture avec Guerite de Gardien, Forage et Travaux au Siege de la FNGPC (abri + installation groupe électrogène + parking couvert)
Project
Projet d'Appui au Secteur Agricole (PASA)
发布日期
状态
Closed
DB Reference No
WB-P331373-03/15
Deadline (local time):
图像
G
Ethiopia
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Procurement of Motorcycles
Project
Agricultural Growth Programme (AGP)
发布日期
状态
Closed
DB Reference No
WB-P331370-03/15
Deadline (local time):
图像
G
Nigeria
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Supply of Communication Test Equipment
Project
UPDATE - Electricity and Gas Improvement Project
发布日期
状态
Closed
DB Reference No
WB-P331367-03/15
Deadline (local time):
图像
C
Ethiopia
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Project Terminal Evaluation (Implementation Performance Evaluation of the Ethiopian Sustainable Tourism Development Project (ESTDP)
Project
Ethiopian Sustainable Tourism Development Project
发布日期
状态
Closed
DB Reference No
WB-P331364-03/15
Deadline (local time):
图像
W
Colombia
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Construcción de la Obra Calle 44 del Sistema Estratégico de Transporte de Valledupar SIVA
Project
Sistemas Integrados de Transporte Masivo y Sistemas Estrategicos de Transporte Público
发布日期
状态
Closed
DB Reference No
WB-P331361-03/15
Deadline (local time):
图像
Indonesia
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Survey on Empowering Women Micro-Entrepreneurs in Indonesia
Project
e-Consult: Survey on Empowering Women Micro-Entrepreneurs in Indonesia
发布日期
状态
Closed
DB Reference No
WB-P331358-03/15
Deadline (local time):
图像
C
Various
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Consultant for Satellite Data Services State of Play
Project
e-Consult: Consultant for Satellite Data Services State of Play
发布日期
状态
Closed
DB Reference No
WB-P331355-03/15
Deadline (local time):
图像
C
Various
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Consultant for Satellite Data Services State of Play
Project
e-Consult: Consultant for Satellite Data Services State of Play
发布日期
状态
Closed
DB Reference No
WB-P331352-03/15
Deadline (local time):
图像
C
Various
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Study on the Poultry Industry in Emerging Markets
Project
e-Consult: Study on the Poultry Industry in Emerging Markets
发布日期
状态
Closed
DB Reference No
WB-P331349-03/15
Deadline (local time):
图像
C
Afghanistan
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Afghanistan: Assessment of Constraints and Opportunities for Short Term Employment Generation Schemes in Urban Areas
Project
e-Consult: Afghanistan: Assessment of Constraints and Opportunities for Short Term Employment Generation Schemes in Urban Areas
发布日期
状态
Closed
DB Reference No
WB-P331346-03/15
Deadline (local time):
图像
C
Indonesia
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Sampling and Survey Methodology on Women Micro-Entrepreneurs in Indonesia
Project
e-Consult: Sampling and Survey Methodology on Women Micro-Entrepreneurs in Indonesia
发布日期
状态
Closed
DB Reference No
WB-P331343-03/15
Deadline (local time):
图像
C
Botswana
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Energy Efficiency Strategy for Botswana
Project
e-Consult: Energy Efficiency Strategy for Botswana
发布日期
状态
Closed
DB Reference No
WB-P331340-03/15
Deadline (local time):
图像
C
Liberia
World Bank
Last updated on 19/03/2015
Favorite this item
标签
Prefeasibility Study of Two Hybrid Mini-Grids in Rural Area of Liberia
Project
e-Consult: Prefeasibility Study of Two Hybrid Mini-Grids in Rural Area of Liberia
发布日期
状态
Closed
DB Reference No
WB-P331337-03/15
Deadline (local time):
图像
W
Honduras
Government Organization
Last updated on 19/03/2015
Favorite this item
标签
<B>REVISION</B> - Contrato de proyecto de Alianza Público-Privada, Centro Cívico Gubernamental
Project
<B>REVISION</B> - Contrato de Alianza Público Privada APP
发布日期
状态
Closed
DB Reference No
GN-P331463-03/15
Deadline (local time):
图像
W
Argentina
Government Organization
Last updated on 19/03/2015
Favorite this item
标签
ESTACION AUTOMATICA DE TESTEO DE CELDAS DE COMBUSTIBLES
Project
COMISION NACIONAL DE ENERGIA ATOMICA
发布日期
状态
Closed
DB Reference No
GN-P331460-03/15
Deadline (local time):
图像
G
Nicaragua
Government Organization
Last updated on 19/03/2015
Favorite this item
标签
Adquisición de Materiales de Electrificación
Project
Proyecto de Electrificación Rural en Nicaragua, Segunda Fase (PELNICA II)
发布日期
状态
Closed
DB Reference No
GN-P331457-03/15
Deadline (local time):