Site search

144925 results

图像
Education
C
Cambodia
World Bank
Last updated on 14/10/2014
Favorite this item
标签

International Individual Consultant to support development of a Policy Paper on Higher Education Governance and Finance

Project Higher Education Quality and Capacity Improvement Project
发布日期
状态 Closed
DB Reference No WB-P350135-10/14
Deadline (local time):
图像
Miscellaneous
G
Moldova
World Bank
Last updated on 13/10/2014
Favorite this item
标签

Automated Information Systems for National Food Safety Agency

Project Agriculture Competitiveness Project
发布日期
状态 Closed
DB Reference No WB-P350072-10/14
Deadline (local time):
图像
transportation
W
Tanzania, United Republic of
African Development Bank
Last updated on 13/10/2014
Favorite this item
标签

CONSULTANCY SERVICES FOR IMPROVEMENT OF ROAD SAFETY, CAPACITY BUILDING AND DATA COLLECTION FOR WIDENING TO DUAL CARRIAGEWAY OF SAKINA – TENGERU SECTION (14.1 KM) AND CONSTRUCTION OF ARUSHA BYPASS ROAD (42.4KM) TO BITUMEN STANDARD; TENDER No. AE/001/2014-1

Project MULTINATIONAL: ARUSHA – HOLILI/TAVETA-VOI ROAD PROJECT
发布日期
状态 Closed
DB Reference No AfDB-P350069-10/14
Deadline (local time):
图像
Education
C
Albania
World Bank
Last updated on 13/10/2014
Favorite this item
标签

Training Services for Drainage Boards (DBs)

Project UPDATE - Water Resources and Irrigation Project
发布日期
状态 Closed
DB Reference No WB-P350066-10/14
Deadline (local time):
图像
Education
C
Armenia
World Bank
Last updated on 13/10/2014
Favorite this item
标签

Training of the Main Group of Local Lecturers for Conducting of courses & Development of 7 training Modules of Policy Analysis, Monitoring, Evaluation and Management, as well as Development of an Educational Manual on Personal Management Skills

Project Second Public Sector Modernization Project
发布日期
状态 Closed
DB Reference No WB-P350063-10/14
Deadline (local time):
图像
transportation
W
India
World Bank
Last updated on 13/10/2014
Favorite this item
标签

Upgrading Rajapalayam – Sankarankoil – Tirunelveli Road ( SH 41) km 1/800 to km 28/00 and km 33/800 to km 82/800 on Engineering, Procurement, Construction ('EPC') basis

Project Tamil Nadu Road Sector Project II
发布日期
状态 Closed
DB Reference No WB-P350060-10/14
Deadline (local time):
图像
transportation
W
India
World Bank
Last updated on 13/10/2014
Favorite this item
标签

Upgrading Paruvakudi – Kovilpatti – Ettayapuram – Vilathikulam – Vembar Road (SH 44) Km 22/500 to Km 38/750 and Km 41/300 to Km 56/700 on Engineering, Procurement, Construction ('EPC') basis

Project Tamil Nadu Road Sector Project II
发布日期
状态 Closed
DB Reference No WB-P350057-10/14
Deadline (local time):
图像
transportation
W
India
World Bank
Last updated on 13/10/2014
Favorite this item
标签

Upgrading Nanguneri – Bharatavaram Ovari Road ( SH 89 ) up to ECR junction Km 0/000 to Km 35/200 on Engineering, Procurement, Construction ('EPC') basis

Project Tamil Nadu Road Sector Project II
发布日期
状态 Closed
DB Reference No WB-P350054-10/14
Deadline (local time):
图像
Education
C
Brazil
Inter-American Development Bank
Last updated on 13/10/2014
Favorite this item
标签

AVISO GERAL DE AQUISIÇÕES (AGA)

Project PROGRAMA DE ACELERAÇÃO DO DESENVOLVIMENTO DA EDUCAÇÃO DO AMAZONAS - PADEAM
发布日期
状态 N/A
DB Reference No IDB-P350051-10/14
图像
Rural
C
Brazil
Inter-American Development Bank
Last updated on 13/10/2014
Favorite this item
标签

SERVIÇOS DE CONSULTORIA - Prestação de serviços de trabalho técnico social para a execução do subcomponente Participação Comunitária do Programa de Urbanização de Assentamentos Populares do Rio de Janeiro – Etapa III (PROAP III)

Project PROGRAMA DE URBANIZAÇÃO DE ASSENTAMENTOS PRECÁRIOS – PROAP III
发布日期
状态 Closed
DB Reference No IDB-P350048-10/14
Deadline (local time):
图像
transportation
W
India
World Bank
Last updated on 13/10/2014
Favorite this item
标签

Upgrading Malliyakarai – Rasipuram – Thiruchengode – Erode Road (SH 79) km 0/000 to km 30/600 and km 51/400 to km 71/300 on Engineering, Procurement, Construction ('EPC') basis

Project Tamil Nadu Road Sector Project II
发布日期
状态 Closed
DB Reference No WB-P350045-10/14
Deadline (local time):
图像
Environment
C
Brazil
Inter-American Development Bank
Last updated on 13/10/2014
Favorite this item
标签

Elaboração de Projetos de Restauração Florestal de APP dos Reservatórios Pedro Moura, Engenho Maranhão e Serra dos Cavalos e respectivos

Project Programa de Saneamento Ambiental da Bacia Hidrográfica do Rio Ipojuca – PSA/Ipojuca
发布日期
状态 Closed
DB Reference No IDB-P350042-10/14
Deadline (local time):
图像
transportation
W
India
World Bank
Last updated on 13/10/2014
Favorite this item
标签

Upgrading Omalur – Sankari – Thiruchengode – Paramathy Road (SH 86) km 54/800 to km 81/000 on Engineering, Procurement, Construction ('EPC') basis

Project Tamil Nadu Road Sector Project II
发布日期
状态 Closed
DB Reference No WB-P350039-10/14
Deadline (local time):
图像
Environment
C
Brazil
Inter-American Development Bank
Last updated on 13/10/2014
Favorite this item
标签

Contratação de empresa de consultoria para realização do diagnóstico da situação ambiental atual da bacia do rio Ipojuca

Project Programa de Saneamento Ambiental da Bacia Hidrográfica do Rio Ipojuca – PSA-Ipojuca
发布日期
状态 Closed
DB Reference No IDB-P350036-10/14
Deadline (local time):
图像
transportation
W
India
World Bank
Last updated on 13/10/2014
Favorite this item
标签

Upgrading Vridhachalam – Parangipettai road (SH 70) km 0/000 to km 35/800

Project Tamil Nadu Road Sector Project II
发布日期
状态 Closed
DB Reference No WB-P350033-10/14
Deadline (local time):
图像
Environment
C
Brazil
Inter-American Development Bank
Last updated on 13/10/2014
Favorite this item
标签

Elaboração de Proposta de Implantação de Outorga de Lançamento de Efluentes na Bacia do Rio Ipojuca.

Project Programa de Saneamento Ambiental da Bacia Hidrográfica do Rio Ipojuca – PSA/Ipojuca
发布日期
状态 Closed
DB Reference No IDB-P350030-10/14
Deadline (local time):
图像
transportation
W
Bangladesh
Asian Development Bank
Last updated on 13/10/2014
Favorite this item
标签

Construction / Improvement of 5 roads; total length 6.555 km, under Galachipa Pourashava, Upazila Galachipa, District: Patuakhali.

Project Coastal Towns Environmental Infrastructure Project
发布日期
状态 Closed
DB Reference No ADB-P350027-10/14
Deadline (local time):
图像
transportation
W
Costa Rica
Inter-American Development Bank
Last updated on 13/10/2014
Favorite this item
标签

Estudio de Pre-ingeniería, selección de trazado y pre-diseño de la ruta nacional No. 35, Punta Sur de la nueva carretera a San Carlos (Intersección con la Ruta Nacional No. 1 Carretera Bernardo Soto-Sifón)

Project Primer Programa de Infraestructura Vial (PIV-I/BID)
发布日期
状态 Closed
DB Reference No IDB-P350024-10/14
Deadline (local time):
图像
Public Sector
C
Nicaragua
Inter-American Development Bank
Last updated on 13/10/2014
Favorite this item
标签

Contratación de servicios de interconexión de datos de agencias fiscales

Project Apoyo a la Gestión Fiscal
发布日期
状态 Closed
DB Reference No IDB-P350021-10/14
Deadline (local time):
图像
transportation
W
India
World Bank
Last updated on 13/10/2014
Favorite this item
标签

Upgrading Cuddalore – Chittoor Road (SH 9) km 41/700 to km 44/000 and km 45/000 to km 66/190 and construction of a new link road between SH9 and SH137 (km 66/190 to km 71/147

Project Tamil Nadu Road Sector Project II
发布日期
状态 Closed
DB Reference No WB-P350018-10/14
Deadline (local time):