Site search

143501 results

图像
Information
W
Cambodia
United Nations Office for Project Services (UNOPS)
Last updated on 25/11/2013
Favorite this item
标签

<b>UPDATE:</b> Procurement of IT Equipmnet

Project United Nations Office for Project Services
发布日期
状态 Closed
DB Reference No UN-P356402-11/13
Deadline (local time):
图像
Miscellaneous
C
Kenya
World Bank
Last updated on 25/11/2013
Favorite this item
标签

Consultancy for Preparation of Resettlement Action Plans (RAP) for NaMSIP Sub-Projects

Project Nairobi Metropolitan Services Improvement Project (NaMSIP)
发布日期
状态 Closed
DB Reference No WB-P356399-11/13
Deadline (local time):
图像
Medical
G
Bangladesh
World Bank
Last updated on 25/11/2013
Favorite this item
标签

Deltamethrin 5% WP & Deltamethrin 25% WT (Water Dispersible Tablet-WT)

Project Health Sector Development Program
发布日期
状态 Closed
DB Reference No WB-P356396-11/13
Deadline (local time):
图像
Environment
C
Congo, Republic of
World Bank
Last updated on 25/11/2013
Favorite this item
标签

Recrutement d’une firme chargée de mener l’étude de faisabilité de la mise en place d’un laboratoire d’analyse des polluants

Project Projet de Forêt et Diversification Economique (PFDE)
发布日期
状态 Closed
DB Reference No WB-P356393-11/13
Deadline (local time):
图像
Miscellaneous
G
Bangladesh
World Bank
Last updated on 25/11/2013
Favorite this item
标签

Supply, Installation, Customizing, Testing, Commissioning of Server, Router, Core switch, Fiber optic cable network, air cooler, etc.

Project Higher Education Quality Enhancement Project
发布日期
状态 Closed
DB Reference No WB-P356390-11/13
Deadline (local time):
图像
Miscellaneous
C
Vietnam
World Bank
Last updated on 25/11/2013
Favorite this item
标签

Research and develop the methodology for assessment of total maximum daily loads and apply to river basin

Project Industrial Pollution Management Project
发布日期
状态 Closed
DB Reference No WB-P356387-11/13
Deadline (local time):
图像
Energy
W
Vietnam
World Bank
Last updated on 25/11/2013
Favorite this item
标签

Package NPC/DEP2.4-110-G01: Procurement, transportation and installation of transformers for 110kV Substations: Luc Nam, Van Ban, Gian Khau, Kim Son 110kV Substations Package NPC/DEP2.4-110-G02: Procurement and transportation of materials and equipment

Project Distribution Efficiency Project
发布日期
状态 Closed
DB Reference No WB-P356384-11/13
Deadline (local time):
图像
water, sanitation, and waste management icon
W
India
World Bank
Last updated on 25/11/2013
Favorite this item
标签

Construction of Ganga River Front Development at Patna

Project National Ganga River Basin Project
发布日期
状态 Closed
DB Reference No WB-P356381-11/13
Deadline (local time):
图像
Energy
C
Bangladesh
World Bank
Last updated on 25/11/2013
Favorite this item
标签

Consulting Services for Layout Master Plan of the Ghorashal, Goalpara and Baghabari Generation Hubs

Project Rural Electrification and Renewable Energy Development II (RERED II) Project
发布日期
状态 Closed
DB Reference No WB-P356378-11/13
Deadline (local time):
图像
Education
W
Argentina
Inter-American Development Bank
Last updated on 22/11/2013
Favorite this item
标签

General Procurement Notice - PROGRAMA DE APOYO A LA POLÍTICA DE MEJORAMIENTO DE LA EQUIDAD EDUCATIVA III (PROMEDU III)

Project .
发布日期
状态 N/A
DB Reference No IDB-P356318-11/13
图像
Information
W
Comoros
African Development Bank
Last updated on 22/11/2013
Favorite this item
标签

Acquisition et l’installation des équipements informatiques pour les Structures de la Chaîne de la Dépense Publique

Project Projet de Renforcement des Capacités Institutionnelles
发布日期
状态 Closed
DB Reference No AfDB-P356315-11/13
Deadline (local time):
图像
Energy
W
Bangladesh
Asian Development Bank
Last updated on 22/11/2013
Favorite this item
标签

Procurement of Design, Engineering, Procurement, Supply, Installation, Commissioning and Testing of two nos. Glycol Dehydration Type Gas Process Plant

Project <B>2nd DEADLINE EXTENSION</B><br/>Natural Gas Access Improvement Project
发布日期
状态 Closed
DB Reference No ADB-P356312-11/13
Deadline (local time):
图像
Environment
W
China
Asian Development Bank
Last updated on 22/11/2013
Favorite this item
标签

Inner Mongolia Autonomous Region Environment Improvement Project - Central Heating Project of Haibowan District of Wuhai City, Procurement of Equipments pre-fabricated insulation pipe and fittings

Project Inner Mongolia Autonomous Region Environmental Improvement
发布日期
状态 Closed
DB Reference No ADB-P356309-11/13
Deadline (local time):
图像
Public Sector
C
Romania
World Bank
Last updated on 22/11/2013
Favorite this item
标签

Design Communication Strategy and Develop Public Relations Skills

Project Revenue Administration Modernization Project (RAMP)
发布日期
状态 Closed
DB Reference No WB-P356306-11/13
Deadline (local time):
图像
Education
C
Belize
Caribbean Development Bank
Last updated on 22/11/2013
Favorite this item
标签

Consultancy Services for Rationalisation and Diversification of the Secondary Curriculum

Project EDUCATION SECTOR REFORM PROJECT
发布日期
状态 Closed
DB Reference No CDB-P356303-11/13
Deadline (local time):
图像
Miscellaneous
C
Congo, Democratic Republic of
World Bank
Last updated on 22/11/2013
Favorite this item
标签

Service de Consultant (ONG ou Bureau d’etudes) Charge de l’enquete par Sondage sur les Revenus et Depenses des Menages (SRDM) Vivant le Long des Axes Selectionnes dans les Provinces Orientale, Katanga, Sud-Kivu et Equateur

Project Projet de Réouverture et d'Entretien des Routes Hautement Prioritaires (PRO-ROUTES)
发布日期
状态 Closed
DB Reference No WB-P356300-11/13
Deadline (local time):
图像
Miscellaneous
C
Various
World Bank
Last updated on 22/11/2013
Favorite this item
标签

e-Consult: Consultant for delivering resource efficiency diagnostic services in ECA region

Project ECA Cleaner Production Project
发布日期
状态 Closed
DB Reference No WB-P356297-11/13
Deadline (local time):
图像
Miscellaneous
C
India
World Bank
Last updated on 22/11/2013
Favorite this item
标签

e-Consult: GAP ANALYSIS AND ROADMAP TO ESTABLISHMENT OF QUALITY ASSURANCE SYSTEM IN THE PRIVATE HEALTH CARE FACILITIES IN UTTAR PRADESH

Project CSA - LAGGING STATES
发布日期
状态 Closed
DB Reference No WB-P356294-11/13
Deadline (local time):
图像
Miscellaneous
C
India
World Bank
Last updated on 22/11/2013
Favorite this item
标签

e-Consult: GAP ANALYSIS AND ROADMAP TO ESTABLISHMENT OF QUALITY ASSURANCE SYSTEM IN THE PRIVATE HEALTH CARE FACILITIES IN UTTAR PRADESH

Project CSA - LAGGING STATES
发布日期
状态 Closed
DB Reference No WB-P356291-11/13
Deadline (local time):
图像
Miscellaneous
C
Ghana
World Bank
Last updated on 22/11/2013
Favorite this item
标签

Oracle Functional HRMIS Expert for the Public Services Commission

Project e-Ghana Project Component 4 – GIFMIS
发布日期
状态 Closed
DB Reference No WB-P356288-11/13
Deadline (local time):