Image
Site search
145392 results
C
Mongolia
World Bank
Last updated on 24/01/2023
Favorite this item
Libellé
eConsult: Update of the public transport sector reform plan and pre-feasibility study and capacity-building for on-demand transit services in Ulaanbaatar
Project
Update of the public transport sector reform plan and pre-feasibility study and capacity-building for on-demand transit services in Ulaanbaatar
Date de publication
État
Closed
DB Reference No
WB-P1128945-01/23
Deadline (local time):
Image
C
Côte d’Ivoire
African Development Bank
Last updated on 24/01/2023
Favorite this item
Libellé
: Recruitment of a long-term individual Consultant to Support IDEV’s Evaluation Capacity Development (ECD) in AfDB Regional Member Countries (RMCs).
Project
Knowledge Management, Outreach and Capacity Development Division (IDEV.3)
Date de publication
État
Closed
DB Reference No
AfDB-P1128933-01/23
Deadline (local time):
Image
C
El Salvador
United Nations Development Programme (UNDP)
Last updated on 24/01/2023
Favorite this item
Libellé
Consultoría para Gestión de Información en El Salvador
Project
United Nations Development Programme
Date de publication
État
Closed
DB Reference No
UN-P1128930-01/23
Deadline (local time):
Image
C
Côte d’Ivoire
African Development Bank
Last updated on 24/01/2023
Favorite this item
Libellé
Individual Consultant to Support IDEV’s Evaluation Capacity Development (ECD) in AfDB Regional Member Countries (RMCs).
Project
Knowledge Management, Outreach and Capacity Development Division (IDEV.3)
Date de publication
État
Closed
DB Reference No
AfDB-P1128927-01/23
Deadline (local time):
Image
C
Indonesia
World Bank
Last updated on 24/01/2023
Favorite this item
Libellé
eConsult: Protecting non-COVID essential health services during the course of the pandemic: challenges and lessons from Indonesia
Project
Protecting non-COVID essential health services during the course of the pandemic: challenges and lessons from Indonesia
Date de publication
État
Closed
DB Reference No
WB-P1128924-01/23
Deadline (local time):
Image
C
Uganda
World Bank
Last updated on 24/01/2023
Favorite this item
Libellé
eConsult: Uganda: Legal and Regulatory Support for Maize Regulations
Project
Uganda: Legal and Regulatory Support for Maize Regulations
Date de publication
État
Closed
DB Reference No
WB-P1128918-01/23
Deadline (local time):
Image
Image
C
Lao People's Democratic Republic
World Bank
Last updated on 24/01/2023
Favorite this item
Libellé
eConsult: Financial Management Training for the Health Sector and capacity building support to the Ministry of Health Department of Inspection for Internal Audit
Project
Financial Management Training for the Health Sector and capacity building support to the Ministry of Health Department of Inspection for Internal Audit
Date de publication
État
Closed
DB Reference No
WB-P1128906-01/23
Deadline (local time):
Image
C
Ethiopia
World Bank
Last updated on 24/01/2023
Favorite this item
Libellé
eConsult: Provision of Call Center Service
Project
Provision of Call Center Service
Date de publication
État
Closed
DB Reference No
WB-P1128900-01/23
Deadline (local time):
Image
G
Suriname
Inter-American Development Bank
Last updated on 24/01/2023
Favorite this item
Libellé
Procurement for Supply and Installation of Distribution Automation field equipment
Project
Consolidating a sustainable energy sector
Date de publication
État
Closed
DB Reference No
IDB-P1128777-01/23
Deadline (local time):
Image
C
Ethiopia
World Bank
Last updated on 24/01/2023
Favorite this item
Libellé
Consultancy Services for EEU Citizen Engagement Program
Project
Ethiopia Electrification program (ELEAP) Project
Date de publication
État
Closed
DB Reference No
WB-P1128795-01/23
Deadline (local time):
Image
C
Honduras
Banco Centro Americano de Integración Económica
Last updated on 23/01/2023
Favorite this item
Libellé
Contratación de Servicios de Ingeniero Estructural para el Diseño de Proyectos de Construcción
Project
Banco Centroamericano de Integración Económica (BCIE)
Date de publication
État
Closed
DB Reference No
BCIE-P1128735-01/23
Deadline (local time):
Image
G
Ethiopia
World Bank
Last updated on 23/01/2023
Favorite this item
Libellé
PROCUREMENT OF 33/0.4KV DISTRIBUTION TRANSFORMERS
Date de publication
État
Closed
DB Reference No
WB-P1128726-01/23
Deadline (local time):
Image
G
Ethiopia
World Bank
Last updated on 23/01/2023
Favorite this item
Libellé
PROCUREMENT OF 15/0.4KV DISTRIBUTION TRANSFORMERS
Project
Ethiopian Electrification Program (ELEAP)
Date de publication
État
Closed
DB Reference No
WB-P1128723-01/23
Deadline (local time):
Image
C
Madagascar
World Bank
Last updated on 23/01/2023
Favorite this item
Libellé
UPDATE- Recrutement de secrétaire
Project
Rural Livelihoods Productivity and Resilience Project
Date de publication
État
Closed
DB Reference No
WB-P1069836-09/22
Deadline (local time):
Image
C
Honduras
World Bank
Last updated on 23/01/2023
Favorite this item
Libellé
UPDATE- CONTRATACIÓN DE UNA FIRMA CONSULTORA PARA LA "ELABORACIÓN Y REVISIÓN DE LOS DISEÑOS Y HERRAMIENTAS CURRICULARES DE LA EDUCACIÓN PREBÁSICA". (4 MESES)
Project
Honduras Early Childhood Education Improvement Project
Date de publication
État
Closed
DB Reference No
WB-P1108543-11/22
Deadline (local time):
Image
C
Georgia,
Armenia
World Bank
Last updated on 23/01/2023
Favorite this item
Libellé
eConsult: Assessment of Public Parks, Recreational Assets, and Green Spaces in selected Towns
Project
Assessment of Public Parks, Recreational Assets, and Green Spaces in selected Towns
Date de publication
État
Closed
DB Reference No
WB-P1128720-01/23
Deadline (local time):
Image
C
Ethiopia
World Bank
Last updated on 23/01/2023
Favorite this item
Libellé
eConsult: DEMAND AND SUPPLY SIDE ASSESSMENT OF CAPACITY BUILDING SERVICES FOR MFI AND BANK STAFF (ETHIOPIA)
Project
DEMAND AND SUPPLY SIDE ASSESSMENT OF CAPACITY BUILDING SERVICES FOR MFI AND BANK STAFF (ETHIOPIA)
Date de publication
État
Closed
DB Reference No
WB-P1128717-01/23
Deadline (local time):
Image
Image
C
Timor-Leste
World Bank
Last updated on 23/01/2023
Favorite this item
Libellé
eConsult: SOCIAL ACCOUNTABILITY AND INCLUSION FOR IMPROVED PUBLIC SPENDING AND SERVICE DELIVERY IN TIMOR-LESTE
Project
SOCIAL ACCOUNTABILITY AND INCLUSION FOR IMPROVED PUBLIC SPENDING AND SERVICE DELIVERY IN TIMOR-LESTE
Date de publication
État
Closed
DB Reference No
WB-P1128714-01/23
Deadline (local time):
Image
Image
C
Guinea
African Development Bank
Last updated on 23/01/2023
Favorite this item
Libellé
Consultant individuel en vue de l’élaboration des cahiers de charge pour la mise en place d’une plateforme de monitoring et de supervision des terminaux de paiement (GAB, TPE, etc.) au sein de la BCRG
Project
PROJET D’APPUI A LA MODERNISATION DU SECTEUR FINANCIER (PAMSFI)
Date de publication
État
Closed
DB Reference No
AfDB-P1128711-01/23
Deadline (local time):
Image
C
Dominican Republic
World Bank
Last updated on 23/01/2023
Favorite this item
Libellé
eConsult: DR BESS Load Flow Analysis Study
Project
DR BESS Load Flow Analysis Study
Date de publication
État
Closed
DB Reference No
WB-P1128708-01/23
Deadline (local time):