图像
Site search
144978 results
C
China
World Bank
Last updated on 19/09/2014
Favorite this item
标签
Dongguan Modern Tram Development Research based on Urban Public Strategy
Project
<B>REVISION</B> - Urban Transport Partnership Program Project
发布日期
状态
Closed
DB Reference No
WB-P348443-09/14
Deadline (local time):
图像
C
Brazil
Inter-American Development Bank
Last updated on 19/09/2014
Favorite this item
标签
Contratação de Consultoria Especializada para o Aprimoramento do Aspecto Metodológico dos Cursos
Project
Programa de Apoio a Melhoria da Gestão por Resultados nos Programas do Ministério das Cidades
发布日期
状态
Closed
DB Reference No
IDB-P348440-09/14
Deadline (local time):
图像
W
Brazil
Inter-American Development Bank
Last updated on 19/09/2014
Favorite this item
标签
Obras de Recondutoramento da LT 138 kV UHE Passo Fundo - Erechim
Project
Programa de Expansão e Modernização do Sistema Elétrico da Região Metropolitana de Porto Alegre e Área de Abrangência da CEEE-GT, Pró-Energia/RS
发布日期
状态
Closed
DB Reference No
IDB-P348437-09/14
Deadline (local time):
图像
G
Guatemala
Inter-American Development Bank
Last updated on 19/09/2014
Favorite this item
标签
Adquisición de Materiales Escolares para estudiantes de preprimaria, 1º y 2º grados de primaria
Project
Mi Escuela Progresa
发布日期
状态
Closed
DB Reference No
IDB-P348434-09/14
Deadline (local time):
图像
C
China
World Bank
Last updated on 19/09/2014
Favorite this item
标签
Consulting service for Jinan Green Public Transport System Study
Project
<B>UPDATE</B> - Urban Transport Partnership Project
发布日期
状态
Closed
DB Reference No
WB-P348431-09/14
Deadline (local time):
图像
W
China
Asian Development Bank
Last updated on 19/09/2014
Favorite this item
标签
Equipment Purchase and Installation for Hexi Sewage Treatment Plant and 3 Pump Stations
Project
Hubei Huangshi Urban Pollution Control and Environmental Management Project
发布日期
状态
Closed
DB Reference No
ADB-P348428-09/14
Deadline (local time):
图像
C
Albania
World Bank
Last updated on 19/09/2014
Favorite this item
标签
Legal Consultant Albania Labs
Project
e-Consult: Legal Consultant Albania Labs
发布日期
状态
Closed
DB Reference No
WB-P348425-09/14
Deadline (local time):
图像
C
China
World Bank
Last updated on 19/09/2014
Favorite this item
标签
Research Agency for China Rural Payment Market Research
Project
e-Consult: Research Agency for China Rural Payment Market Research
发布日期
状态
Closed
DB Reference No
WB-P348422-09/14
Deadline (local time):
图像
W
China
Asian Development Bank
Last updated on 19/09/2014
Favorite this item
标签
Supply of Heating Pipeline, Heating Exchange Station and SCADA System Equipment for Fuxin Sihe District Heating Project
Project
Integrated Development of Key Townships in Central Liaoning
发布日期
状态
Closed
DB Reference No
ADB-P348419-09/14
Deadline (local time):
图像
W
Congo, Democratic Republic of
African Development Bank
Last updated on 19/09/2014
Favorite this item
标签
Lot 1 : acquisition de trois (3) Véhicules utilitaires 4x4 station wagon; Lot 2 : acquisition de quatre (4) pick-up 4x4 double cabine; Lot 3 : acquisition de vingt (20) motocycles
Project
Projet de Renforcement des Infrastructures Socioéconomiques dans la Zone Centre de la RDC (Kasaï Occidental et Kasaï Oriental) - 'PRISE'
发布日期
状态
Closed
DB Reference No
AfDB-P348506-09/14
Deadline (local time):
图像
C
Madagascar
African Development Bank
Last updated on 19/09/2014
Favorite this item
标签
CONSULTANT SERVICES
Project
PROJET DE REHABILITATION DES INFRASTRUCTURES AGRICOLESDE LA REGION SUD-OUEST
发布日期
状态
Closed
DB Reference No
AfDB-P348503-09/14
Deadline (local time):
图像
G
Peru
Inter-American Development Bank
Last updated on 19/09/2014
Favorite this item
标签
Adquisición de equipo de videoconferencia para los establecimientos de salud del primer nivel de atención priorizados para integrar las Redes Regionales de Telesalud en las Regiones Amazonas, Huánuco y Ucayali en el marco de la implementación del modelo d
Project
Segunda Fase del Programa de Apoyo a la Reforma del Sector Salud – PARSALUD II
发布日期
状态
Closed
DB Reference No
IDB-P348500-09/14
Deadline (local time):
图像
C
Regional - Africa
African Development Bank
Last updated on 19/09/2014
Favorite this item
标签
TECHNICAL ASSISTANT/INDIVIDUAL CONSULTANT
Project
Lake Victoria Water Supply and Sanitation Program Phase II (LVWATSAN II)
发布日期
状态
Closed
DB Reference No
AfDB-P348497-09/14
Deadline (local time):
图像
W
Burundi
African Development Bank
Last updated on 19/09/2014
Favorite this item
标签
General Procurement Notice
Project
PROJET HYDROELECTRIQUE DE JIJI ET MULEMBWE (PHJIMU
发布日期
状态
N/A
DB Reference No
AfDB-P348494-09/14
图像
C
Nicaragua
Inter-American Development Bank
Last updated on 19/09/2014
Favorite this item
标签
Asesoría Técnica de Firmas Internacionales sobre Proceso de Fiscalización por Sector Económico
Project
Apoyo a la Gestión Fiscal
发布日期
状态
Closed
DB Reference No
IDB-P348491-09/14
Deadline (local time):
图像
W
Morocco
African Development Bank
Last updated on 19/09/2014
Favorite this item
标签
<b> UPDATE</b> - Etudes d’exécution, la Réalisation du génie-civil, la Fourniture du Matériel et des équipements, le Ttransport, le Montage, les Eessais et la Mise en Service de la STEP Abdelmoumen.
Project
Station de Transfert d’Energie par Pompage (STEP) Abdelmoumen (350 MW)
发布日期
状态
Closed
DB Reference No
AfDB-P348488-09/14
Deadline (local time):
图像
图像
W
Mauritius
African Development Bank
Last updated on 19/09/2014
Favorite this item
标签
GENERAL PROCUREMENT NOTICE
Project
MIC TAF Grant: Technical Assistance and Capacity Development for Dam Development
发布日期
状态
N/A
DB Reference No
AfDB-P348485-09/14
图像
C
Nicaragua
Inter-American Development Bank
Last updated on 19/09/2014
Favorite this item
标签
Asesorías técnicas de consultores nacionales sobre procesos de fiscalización por Sector Económico
Project
Apoyo a la Gestión Fiscal
发布日期
状态
Closed
DB Reference No
IDB-P348482-09/14
Deadline (local time):
图像
India
World Bank
Last updated on 19/09/2014
Favorite this item
标签
Detailed Feasibility Study for Capacity Augmentation of National Waterway-1 and Detailed Engineering for its Ancillary Works and processes
Project
National Waterways Development Project
发布日期
状态
Closed
DB Reference No
WB-P348479-09/14
Deadline (local time):
图像
C
India
World Bank
Last updated on 19/09/2014
Favorite this item
标签
Consultancy for Environmental and Social Impact Assessment (ESIA), Environmental Management Plan (EMP) and Resettlement Action Plan (RAP) for Capacity Augmentation of the National Waterway-1 between Haldia and Allahabad
Project
National Waterways Development Project
发布日期
状态
Closed
DB Reference No
WB-P348476-09/14
Deadline (local time):