图像
Site search
144978 results
C
Various
World Bank
Last updated on 18/09/2014
Favorite this item
标签
SENIOR ENERGY SPECIALIST (FOSSIL FUELS)(CONSULTANT)
Project
eConsult: Energy Subsidy Reform and Delivery: Safeguarding the Poor and Vulnerable
发布日期
状态
Closed
DB Reference No
WB-P348302-09/14
Deadline (local time):
图像
C
Various
World Bank
Last updated on 18/09/2014
Favorite this item
标签
Global SME Finance Initiative/SME Finance Unit, Financial Institutions Group
Project
eConsult: Global SME Initiative-Capacity Building For SME Finance
发布日期
状态
Closed
DB Reference No
WB-P348299-09/14
Deadline (local time):
图像
C
Jamaica
Inter-American Development Bank
Last updated on 18/09/2014
Favorite this item
标签
Partnering with Parents to Foster Academic Success
Project
eSourcing notice
发布日期
状态
Closed
DB Reference No
IDB-P348377-09/14
Deadline (local time):
图像
W
China
Asian Development Bank
Last updated on 18/09/2014
Favorite this item
标签
Civil Works for Fenggang River Improvement in Fuzhou City, Jiangxi Province
Project
Jiangxi Fuzhou Urban Integrated Infrastructure Improvement Project
发布日期
状态
Closed
DB Reference No
ADB-P348374-09/14
Deadline (local time):
图像
C
Djibouti
World Bank
Last updated on 18/09/2014
Favorite this item
标签
Recrutement d'Un Consultant pour le Formation en Iconographie
Project
Projet d'appui des Capacités Institutionnelles et de Gestion de l'éducation et de la Formation (ACIGEF)
发布日期
状态
Closed
DB Reference No
WB-P348371-09/14
Deadline (local time):
图像
W
Argentina
World Bank
Last updated on 18/09/2014
Favorite this item
标签
Supervisión de Obra de Infraestructura BRT Tramos I y II (20 km) RN N° 3 La Matanza
Project
Proyecto de Transporte Urbano para Áreas Metropolitanas (PTUMA).
发布日期
状态
Closed
DB Reference No
WB-P348368-09/14
Deadline (local time):
图像
C
Croatia
World Bank
Last updated on 18/09/2014
Favorite this item
标签
Communication Services for Positive Effects of Natura 2000 in Croatia
Project
<B>UPDATE</B> - Croatia EU Natura 2000 Integration Project (NIP)
发布日期
状态
Closed
DB Reference No
WB-P348365-09/14
Deadline (local time):
图像
C
Lao People's Democratic Republic
World Bank
Last updated on 18/09/2014
Favorite this item
标签
International Consultant to Plan and Supervise a Survey of External NTM’s in Lao PDR
Project
Second Trade Development Facility Project
发布日期
状态
Closed
DB Reference No
WB-P348362-09/14
Deadline (local time):
图像
C
Kenya
World Bank
Last updated on 18/09/2014
Favorite this item
标签
Preparation of Water Distribution Master Plans for Water Service Providers (5 WSPS) in Mombasa, Kilifi, Taita Taveta and Kwale Counties
Project
Water and Sanitation Service Improvement Project – Additional Financing (WaSSIP - AF)
发布日期
状态
Closed
DB Reference No
WB-P348356-09/14
Deadline (local time):
图像
C
Mongolia
World Bank
Last updated on 18/09/2014
Favorite this item
标签
Preparation of Operations Manual
Project
Index-Based Livestock Insurance Project
发布日期
状态
Closed
DB Reference No
WB-P348353-09/14
Deadline (local time):
图像
C
Mongolia
World Bank
Last updated on 18/09/2014
Favorite this item
标签
Capital Adequacy Assessment
Project
Index-Based Livestock Insurance Project
发布日期
状态
Closed
DB Reference No
WB-P348350-09/14
Deadline (local time):
图像
C
Kenya
World Bank
Last updated on 18/09/2014
Favorite this item
标签
Individual Consultants - Airports Sector Advisor and Ports Sector Advisor
Project
Infrastructure Finance and Public Private Partnerships Project
发布日期
状态
Closed
DB Reference No
WB-P348347-09/14
Deadline (local time):
图像
C
China
World Bank
Last updated on 18/09/2014
Favorite this item
标签
General Procurement Notice (GPN)
Project
Jiaozuo Green Transport and Safety Improvement Project
发布日期
状态
N/A
DB Reference No
WB-P348344-09/14
图像
G
India
World Bank
Last updated on 18/09/2014
Favorite this item
标签
Supply and Installation of all hardware and software components of Advanced Metering Infrastructure (AMI) System in DHBVN with post commissioning operation and maintenance for 5 years
Project
UPDATE - Haryana Power System Improvement Project
发布日期
状态
Closed
DB Reference No
WB-P348341-09/14
Deadline (local time):
图像
G
Last updated on 18/09/2014
Favorite this item
标签
Procurement of IT equipment and Office equipment with preinstalled MS Office and Providing Trainings
Project
National Water Resources Management Project
发布日期
状态
Closed
DB Reference No
WB-P348338-09/14
Deadline (local time):
图像
C
Yemen
World Bank
Last updated on 18/09/2014
Favorite this item
标签
Tax Risk Based Assessment IT Tool for Audits - Yemen Tax Simplification
Project
eConsult: AS Yemen Program - IC component
发布日期
状态
Closed
DB Reference No
WB-P348335-09/14
Deadline (local time):
图像
C
Bangladesh
World Bank
Last updated on 18/09/2014
Favorite this item
标签
International Consulting Firm: Promoting Cleaner Production in the Textile Washing/Dyeing/Finishing sector in Bangladesh
Project
eConsult: Bangladesh Water PaCT trust fund
发布日期
状态
Closed
DB Reference No
WB-P348332-09/14
Deadline (local time):
图像
C
Jordan
European Bank for Reconstruction and Development
Last updated on 18/09/2014
Favorite this item
标签
MSME Lending Capacity Building for Partner Banks
Project
Jordan MSME Framework
发布日期
状态
Closed
DB Reference No
EBRD-P348395-09/14
Deadline (local time):
图像
W
Türkiye
European Bank for Reconstruction and Development
Last updated on 18/09/2014
Favorite this item
标签
DESIGN-BUILD AND OPERATION OF MEZITLI WASTEWATER TREATMENT PLANT (CONTRACT NO: MEZ-W01)
Project
MERSIN WASTEWATER PROJECT
发布日期
状态
Closed
DB Reference No
EBRD-P348392-09/14
Deadline (local time):
图像
W
Brazil
Government Organization
Last updated on 18/09/2014
Favorite this item
标签
Prestação de serviços técnicos de engenharia consultiva internacional para apoio na execução do Trecho Imerso e estruturas de transição do empreendimento submerso – Túnel Santos-Guarujá
Project
<B>UPDATE</B> - DERSA
发布日期
状态
Closed
DB Reference No
GN-P348389-09/14
Deadline (local time):