Site search

143545 results

图像
Construction
W
Kenya
World Bank
Last updated on 23/12/2013
Favorite this item
标签

Bulk Water Supply for Nairobi: Construction of Northern Collector Tunnel Phase 1

Project UPDATE: Water and Sanitation Service Improvement Project Additional Financing (WaSSIP AF)
发布日期
状态 Closed
DB Reference No WB-P358421-12/13
Deadline (local time):
图像
Miscellaneous
C
Afghanistan
World Bank
Last updated on 23/12/2013
Favorite this item
标签

Consultancy Services Petroleum Engineer ( International Experience)

Project Sustainable Development of Natural Resources Project
发布日期
状态 Closed
DB Reference No WB-P358418-12/13
Deadline (local time):
图像
water, sanitation, and waste management icon
C
Croatia
World Bank
Last updated on 23/12/2013
Favorite this item
标签

Preparation of design documentation and studies for application for EU funds (wastewater disposal and water supply), sub-project Opatija, Northern coastal area

Project Coastal Cities Water Pollution Control Project 2
发布日期
状态 Closed
DB Reference No WB-P358415-12/13
Deadline (local time):
图像
water, sanitation, and waste management icon
G
Jordan
World Bank
Last updated on 23/12/2013
Favorite this item
标签

Medium Size Solid Waste Compactors

Project Regional and Local Development Project (RLDP)
发布日期
状态 Closed
DB Reference No WB-P358412-12/13
Deadline (local time):
图像
Social services
C
Brazil
Inter-American Development Bank
Last updated on 23/12/2013
Favorite this item
标签

Serviços Técnicos Especializados de Consultoria para Apoio à Coordenação das Ações Sociais, nos municípios de São Paulo, Guarulhos e Arujá

Project Projeto Rodoanel Mario Covas – Trecho Norte.
发布日期
状态 Closed
DB Reference No IDB-P358409-12/13
Deadline (local time):
图像
Miscellaneous
C
Brazil
United Nations Development Programme (UNDP)
Last updated on 23/12/2013
Favorite this item
标签

Specialized Consultant Service by UNDP

Project UNITED NATIONS DEVELOPMENT PROGRAMME – UNDP
发布日期
状态 Closed
DB Reference No UN-P358406-12/13
Deadline (local time):
图像
Miscellaneous
C
Mongolia
European Bank for Reconstruction and Development
Last updated on 23/12/2013
Favorite this item
标签

Strengthening enforcement of court decisions - Capacity Building (Phase 1)

Project STRENGTHENING ENFORCEMENT OF COURT DECISIONS - CAPACITY BUILDING (PHASE 1)
发布日期
状态 Closed
DB Reference No EBRD-P358403-12/13
Deadline (local time):
图像
Miscellaneous
C
Colombia
World Bank
Last updated on 20/12/2013
Favorite this item
标签

e-Consult: Financing Options for the Bogota Metro Project

Project Financing Options for the Bogota Metro Project
发布日期
状态 Closed
DB Reference No WB-P358331-12/13
Deadline (local time):
图像
Miscellaneous
C
Various
World Bank
Last updated on 20/12/2013
Favorite this item
标签

e-Consult: Green Housing and Energy Efficiency Initiative

Project Housing Finance - Green Mortgage Toolkit
发布日期
状态 Closed
DB Reference No WB-P358328-12/13
Deadline (local time):
图像
Information
G
Armenia
World Bank
Last updated on 20/12/2013
Favorite this item
标签

Procurement of IT Equipment for Data Processing Center and Disaster Recovery and Equipment for Local Network Capability Enhancement

Project UPDATE - Tax Administration Modernization Project
发布日期
状态 Closed
DB Reference No WB-P358325-12/13
Deadline (local time):
图像
Miscellaneous
C
Nigeria
World Bank
Last updated on 20/12/2013
Favorite this item
标签

Technical Assistance for Engineering Design, Preparation of Bidding Document and Site Supervision for a Standard Transformer Repair Workshop at Ojo Transmission Substation, Lagos

Project Nigeria Electricity & Gas Improvement Project (NEGIP)
发布日期
状态 Closed
DB Reference No WB-P358322-12/13
Deadline (local time):
图像
Miscellaneous
C
Kenya
World Bank
Last updated on 20/12/2013
Favorite this item
标签

Consultancy Services for Feasibility Studies, Detailed Designs, Preparation of Tender Documents and Operations And Maintenance Manuals for Proposed Accessroads for Cluster 1 (Embu, Kitui, Garissa & Malindi) and Cluster 2 (Eldoret, Nakuru & Naivasha)

Project Kenya Municipal Program (KMP)
发布日期
状态 Closed
DB Reference No WB-P358319-12/13
Deadline (local time):
图像
Miscellaneous
C
Kenya
World Bank
Last updated on 20/12/2013
Favorite this item
标签

Consultancy Services for Mapping of all Illegal Connections to the Mombasa Stormwater Drainage System

Project Kenya Municipal Program (KMP)
发布日期
状态 Closed
DB Reference No WB-P358316-12/13
Deadline (local time):
图像
Miscellaneous
C
Kenya
World Bank
Last updated on 20/12/2013
Favorite this item
标签

Consultancy Services for Updating Mombasa Stormwater Drainage Master Plan and Preparation of Master Plans for Kitui, Naivasha, Nakuru, Machakos, Kakamega, Garissa and Embu Towns

Project Kenya Municipal Program (KMP)
发布日期
状态 Closed
DB Reference No WB-P358313-12/13
Deadline (local time):
图像
Miscellaneous
C
Various
World Bank
Last updated on 20/12/2013
Favorite this item
标签

e-Consult: Senior Gender Agribusiness Specialist

Project SBA NIPP Women in Business (WIN)
发布日期
状态 Closed
DB Reference No WB-P358310-12/13
Deadline (local time):
图像
Miscellaneous
C
Sierra Leone
World Bank
Last updated on 20/12/2013
Favorite this item
标签

e-Consult: Value Chain Analysis of the Oil Palm Sector in Sierra Leone

Project SBA GAFSP SSA
发布日期
状态 Closed
DB Reference No WB-P358307-12/13
Deadline (local time):
图像
Miscellaneous
C
China
World Bank
Last updated on 20/12/2013
Favorite this item
标签

Provincial Level Climate Technology Needs Assessment

Project Technology Needs Assessment (TNA)
发布日期
状态 Closed
DB Reference No WB-P358304-12/13
Deadline (local time):
图像
Energy
W
North Macedonia
European Bank for Reconstruction and Development
Last updated on 20/12/2013
Favorite this item
标签

Boskov Most Hydro Power Project

Project BOSKOV MOST HYDRO POWER PROJECT
发布日期
状态 Closed
DB Reference No EBRD-P358301-12/13
Deadline (local time):
图像
water, sanitation, and waste management icon
W
European Bank for Reconstruction and Development
Last updated on 20/12/2013
Favorite this item
标签

General Procurement Notice (GPN) - Kant Water Project

Project KANT WATER PROJECT
发布日期
状态 Closed
DB Reference No EBRD-P358298-12/13
Deadline (local time):
图像
Miscellaneous
C
Various
World Bank
Last updated on 20/12/2013
Favorite this item
标签

e-Consult: Program Analyst - Readiness Programme of the Adaptation Fund

Project Admin. Budget for the AF Secretariat - Disbursing Child Fund
发布日期
状态 Closed
DB Reference No WB-P358295-12/13
Deadline (local time):