Image
Site search
143545 results
W
Kenya
World Bank
Last updated on 23/12/2013
Favorite this item
Libellé
Bulk Water Supply for Nairobi: Construction of Northern Collector Tunnel Phase 1
Project
UPDATE: Water and Sanitation Service Improvement Project Additional Financing (WaSSIP AF)
Date de publication
État
Closed
DB Reference No
WB-P358421-12/13
Deadline (local time):
Image
C
Afghanistan
World Bank
Last updated on 23/12/2013
Favorite this item
Libellé
Consultancy Services Petroleum Engineer ( International Experience)
Project
Sustainable Development of Natural Resources Project
Date de publication
État
Closed
DB Reference No
WB-P358418-12/13
Deadline (local time):
Image
C
Croatia
World Bank
Last updated on 23/12/2013
Favorite this item
Libellé
Preparation of design documentation and studies for application for EU funds (wastewater disposal and water supply), sub-project Opatija, Northern coastal area
Project
Coastal Cities Water Pollution Control Project 2
Date de publication
État
Closed
DB Reference No
WB-P358415-12/13
Deadline (local time):
Image
G
Jordan
World Bank
Last updated on 23/12/2013
Favorite this item
Libellé
Medium Size Solid Waste Compactors
Project
Regional and Local Development Project (RLDP)
Date de publication
État
Closed
DB Reference No
WB-P358412-12/13
Deadline (local time):
Image
C
Brazil
Inter-American Development Bank
Last updated on 23/12/2013
Favorite this item
Libellé
Serviços Técnicos Especializados de Consultoria para Apoio à Coordenação das Ações Sociais, nos municípios de São Paulo, Guarulhos e Arujá
Project
Projeto Rodoanel Mario Covas – Trecho Norte.
Date de publication
État
Closed
DB Reference No
IDB-P358409-12/13
Deadline (local time):
Image
C
Brazil
United Nations Development Programme (UNDP)
Last updated on 23/12/2013
Favorite this item
Libellé
Specialized Consultant Service by UNDP
Project
UNITED NATIONS DEVELOPMENT PROGRAMME – UNDP
Date de publication
État
Closed
DB Reference No
UN-P358406-12/13
Deadline (local time):
Image
C
Mongolia
European Bank for Reconstruction and Development
Last updated on 23/12/2013
Favorite this item
Libellé
Strengthening enforcement of court decisions - Capacity Building (Phase 1)
Project
STRENGTHENING ENFORCEMENT OF COURT DECISIONS - CAPACITY BUILDING (PHASE 1)
Date de publication
État
Closed
DB Reference No
EBRD-P358403-12/13
Deadline (local time):
Image
C
Colombia
World Bank
Last updated on 20/12/2013
Favorite this item
Libellé
e-Consult: Financing Options for the Bogota Metro Project
Project
Financing Options for the Bogota Metro Project
Date de publication
État
Closed
DB Reference No
WB-P358331-12/13
Deadline (local time):
Image
C
Various
World Bank
Last updated on 20/12/2013
Favorite this item
Libellé
e-Consult: Green Housing and Energy Efficiency Initiative
Project
Housing Finance - Green Mortgage Toolkit
Date de publication
État
Closed
DB Reference No
WB-P358328-12/13
Deadline (local time):
Image
G
Armenia
World Bank
Last updated on 20/12/2013
Favorite this item
Libellé
Procurement of IT Equipment for Data Processing Center and Disaster Recovery and Equipment for Local Network Capability Enhancement
Project
UPDATE - Tax Administration Modernization Project
Date de publication
État
Closed
DB Reference No
WB-P358325-12/13
Deadline (local time):
Image
C
Nigeria
World Bank
Last updated on 20/12/2013
Favorite this item
Libellé
Technical Assistance for Engineering Design, Preparation of Bidding Document and Site Supervision for a Standard Transformer Repair Workshop at Ojo Transmission Substation, Lagos
Project
Nigeria Electricity & Gas Improvement Project (NEGIP)
Date de publication
État
Closed
DB Reference No
WB-P358322-12/13
Deadline (local time):
Image
C
Kenya
World Bank
Last updated on 20/12/2013
Favorite this item
Libellé
Consultancy Services for Feasibility Studies, Detailed Designs, Preparation of Tender Documents and Operations And Maintenance Manuals for Proposed Accessroads for Cluster 1 (Embu, Kitui, Garissa & Malindi) and Cluster 2 (Eldoret, Nakuru & Naivasha)
Project
Kenya Municipal Program (KMP)
Date de publication
État
Closed
DB Reference No
WB-P358319-12/13
Deadline (local time):
Image
C
Kenya
World Bank
Last updated on 20/12/2013
Favorite this item
Libellé
Consultancy Services for Mapping of all Illegal Connections to the Mombasa Stormwater Drainage System
Project
Kenya Municipal Program (KMP)
Date de publication
État
Closed
DB Reference No
WB-P358316-12/13
Deadline (local time):
Image
C
Kenya
World Bank
Last updated on 20/12/2013
Favorite this item
Libellé
Consultancy Services for Updating Mombasa Stormwater Drainage Master Plan and Preparation of Master Plans for Kitui, Naivasha, Nakuru, Machakos, Kakamega, Garissa and Embu Towns
Project
Kenya Municipal Program (KMP)
Date de publication
État
Closed
DB Reference No
WB-P358313-12/13
Deadline (local time):
Image
C
Various
World Bank
Last updated on 20/12/2013
Favorite this item
Libellé
e-Consult: Senior Gender Agribusiness Specialist
Project
SBA NIPP Women in Business (WIN)
Date de publication
État
Closed
DB Reference No
WB-P358310-12/13
Deadline (local time):
Image
C
Sierra Leone
World Bank
Last updated on 20/12/2013
Favorite this item
Libellé
e-Consult: Value Chain Analysis of the Oil Palm Sector in Sierra Leone
Project
SBA GAFSP SSA
Date de publication
État
Closed
DB Reference No
WB-P358307-12/13
Deadline (local time):
Image
C
China
World Bank
Last updated on 20/12/2013
Favorite this item
Libellé
Provincial Level Climate Technology Needs Assessment
Project
Technology Needs Assessment (TNA)
Date de publication
État
Closed
DB Reference No
WB-P358304-12/13
Deadline (local time):
Image
W
North Macedonia
European Bank for Reconstruction and Development
Last updated on 20/12/2013
Favorite this item
Libellé
Boskov Most Hydro Power Project
Project
BOSKOV MOST HYDRO POWER PROJECT
Date de publication
État
Closed
DB Reference No
EBRD-P358301-12/13
Deadline (local time):
Image
W
Last updated on 20/12/2013
Favorite this item
Libellé
General Procurement Notice (GPN) - Kant Water Project
Project
KANT WATER PROJECT
Date de publication
État
Closed
DB Reference No
EBRD-P358298-12/13
Deadline (local time):
Image
C
Various
World Bank
Last updated on 20/12/2013
Favorite this item
Libellé
e-Consult: Program Analyst - Readiness Programme of the Adaptation Fund
Project
Admin. Budget for the AF Secretariat - Disbursing Child Fund
Date de publication
État
Closed
DB Reference No
WB-P358295-12/13
Deadline (local time):