الصورة
Site search
145032 results
W
Liberia
Government Organization
Last updated on 08/08/2014
Favorite this item
التسمية
Rehabilitation and upgrading runway 04-22 at Roberts International Airport which shall be undertaken whilst the airport remains operational
Project
REHABILITATION AND UPGRADING OF RUNWAY 04-22 AT ROBERTS INTERNATIONAL AIRPORT
Date posted
الحالة
Closed
DB Reference No
GN-P345605-08/14
Deadline (local time):
الصورة
الصورة
W
Brazil
Inter-American Development Bank
Last updated on 08/08/2014
Favorite this item
التسمية
Contratação de empresa de construção civil para reforma das instalações físicas da Agência de Atendimento da Secretaria da Fazenda no município de Uruçuí/PI
Project
Projeto de Desenvolvimento e Aperfeiçoamento da Gestão Fiscal do Estado do Piauí (PROFISCO)
Date posted
الحالة
Closed
DB Reference No
IDB-P345602-08/14
Deadline (local time):
الصورة
C
Brazil
Inter-American Development Bank
Last updated on 08/08/2014
Favorite this item
التسمية
Contratação de empresa para proceder à atualização, complementação e conferência dos dados cadastrais, serviços estes denominados Censo Previdenciário.
Project
Programa de Apoio à Modernização da Gestão do Sistema de Previdência Social (PROPREV – Segunda Fase)
Date posted
الحالة
Closed
DB Reference No
IDB-P345665-08/14
Deadline (local time):
الصورة
Regional - Latin America and The Caribbean
Inter-American Development Bank
Last updated on 08/08/2014
Favorite this item
التسمية
GENERAL PROCUREMENT NOTICE
Project
Support for CARILEC’s Climate Change Adaptation and Sustainable Energy Programming
Date posted
الحالة
N/A
DB Reference No
IDB-P345662-08/14
الصورة
C
United States
Organization of American States
Last updated on 08/08/2014
Favorite this item
التسمية
EVALUATION OF THE INTER-AMERICAN PROGRAM ON EDUCATION FOR DEMOCRATIC VALUES AND PRACTICES (EDUCADEM)
Project
<B>UPDATE</B> - REQUEST FOR PROPOSALS
Date posted
الحالة
Closed
DB Reference No
OAS-P345659-08/14
Deadline (local time):
الصورة
C
Ecuador
Inter-American Development Bank
Last updated on 08/08/2014
Favorite this item
التسمية
ESTUDIO DE LA LINEA DE SUBTRANSMISION A 69 KV. YAGUACHI - BABAHOYO, DE 38 KM., DE LONG. CONDUCTOR 500 MCM ACAR, NEUTRO CON OPGW DE 24 FIBRAS, INCLUYE FRANJA DE SERVIDUMBRE
Project
PROGRAMA DE REFORZAMIENTO DEL SISTEMA NACIONAL DE DISTRIBUCIÓN
Date posted
الحالة
Closed
DB Reference No
IDB-P345656-08/14
Deadline (local time):
الصورة
W
Pakistan
Asian Development Bank
Last updated on 08/08/2014
Favorite this item
التسمية
Procurement of 132 kV Grid Station Equipment
Project
Power Distribution Enhancement Investment Program, Tranche-IV
Date posted
الحالة
Closed
DB Reference No
ADB-P345653-08/14
Deadline (local time):
الصورة
C
Uganda
World Bank
Last updated on 07/08/2014
Favorite this item
التسمية
Consultancy Services for Preparation of a Strategic Environmental and Social Assessment (SESA) For Uganda’s National REDD+ Programme
Project
<B>UPDATE</B> - REDD+ Readiness Preparation Support
Date posted
الحالة
Closed
DB Reference No
WB-P345497-08/14
Deadline (local time):
الصورة
C
Uganda
World Bank
Last updated on 07/08/2014
Favorite this item
التسمية
Consultancy Services for Preparation of a Strategic Environmental and Social Assessment (SESA) for Uganda’s National REDD+ Programme
Project
<B>DUPLICATE NOTICE</B> - REDD+ Readiness Preparation Support Project
Date posted
الحالة
Closed
DB Reference No
WB-P345494-08/14
Deadline (local time):
الصورة
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
التسمية
Assist in the Improvement of Natural Gas Reserves and Resources Estimates in Peru
Project
eConsult: Peru Developing a New Natural Gas Development and Use Policy
Date posted
الحالة
Closed
DB Reference No
WB-P345491-08/14
Deadline (local time):
الصورة
C
Uganda
World Bank
Last updated on 07/08/2014
Favorite this item
التسمية
Consultancy Services for Strengthening National Feedback and Grievance Redress Mechanism for Redd+ for Uganda’s Redd+ Programme
Project
<B>UPDATE</B> - REDD+ Readiness Preparation Support Project
Date posted
الحالة
Closed
DB Reference No
WB-P345488-08/14
Deadline (local time):
الصورة
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
التسمية
Support Implementation of World Bank project 'Developing a New Natural Gas Use Policy for Peru'
Project
eConsult: Peru Developing a New Natural Gas Development and Use Policy
Date posted
الحالة
Closed
DB Reference No
WB-P345485-08/14
Deadline (local time):
الصورة
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
التسمية
Revision of Existing Natural Gas Transport and Distribution Contracts in Peru
Project
eConsult: Peru Developing a New Natural Gas Development and Use Policy
Date posted
الحالة
Closed
DB Reference No
WB-P345482-08/14
Deadline (local time):
الصورة
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
التسمية
Assess and Reinforce the Natural Gas Massification Plan
Project
eConsult: Peru Developing a New Natural Gas Development and Use Policy
Date posted
الحالة
Closed
DB Reference No
WB-P345479-08/14
Deadline (local time):
الصورة
C
Nigeria
World Bank
Last updated on 07/08/2014
Favorite this item
التسمية
Selection of Consultants for Design of Enhanced Business Processes & Change Management Strategy for Institutionalizing Road Asset Management
Project
Federal Roads Development Project
Date posted
الحالة
Closed
DB Reference No
WB-P345476-08/14
Deadline (local time):
الصورة
W
Sri Lanka
Asian Development Bank
Last updated on 07/08/2014
Favorite this item
التسمية
Supply, Installation & Commissioning of SIV Meters and Supply & Delivery of Electromagnetic Flow Meters for Use in DMA Implementation; Supply, Installation & Commissioning of AMR Meters and Supply, Delivery & Installation of IT Equipment
Project
<B>UPDATE</B> - Greater Colombo Water & Wastewater Management Improvement Investment Programme – Project 1
Date posted
الحالة
Closed
DB Reference No
ADB-P345473-08/14
Deadline (local time):
الصورة
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
التسمية
Developing a Gas Master Plan for the North and South of Peru
Project
eConsult: Peru Developing a New Natural Gas Development and Use Policy
Date posted
الحالة
Closed
DB Reference No
WB-P345470-08/14
Deadline (local time):
الصورة
C
Mozambique
World Bank
Last updated on 07/08/2014
Favorite this item
التسمية
Consultancy Service for Reviewing the Maputo Municipality Urban Structure Plan - (PEUMM - Plano de Estrutura Ubana do Munícipio de Maputo)
Project
Programa de Desenvolvimento do Municipio De Maputo II – PROMAPUTO II
Date posted
الحالة
Closed
DB Reference No
WB-P345467-08/14
Deadline (local time):
الصورة
C
Uzbekistan
World Bank
Last updated on 07/08/2014
Favorite this item
التسمية
Gas and Power Engineer
Project
eConsult notice
Date posted
الحالة
Closed
DB Reference No
WB-P345464-08/14
Deadline (local time):
الصورة
C
North Macedonia
World Bank
Last updated on 07/08/2014
Favorite this item
التسمية
Assessing the Impact on Poverty Reduction and Social Inclusion through Improved Connectivity along Rehabilitated/Upgraded Roads and Capacity Building to Streamline Poverty Reduction
Project
eConsult: Assessing the Impact on Poverty Reduction and Social Inclusion through Improved Connectivity along Newly Rehabilitated/Upgraded Roads and capacity building to streamline poverty reduction consideration in investment planning
Date posted
الحالة
Closed
DB Reference No
WB-P345461-08/14
Deadline (local time):