图像
Site search
145032 results
W
Liberia
Government Organization
Last updated on 08/08/2014
Favorite this item
标签
Rehabilitation and upgrading runway 04-22 at Roberts International Airport which shall be undertaken whilst the airport remains operational
Project
REHABILITATION AND UPGRADING OF RUNWAY 04-22 AT ROBERTS INTERNATIONAL AIRPORT
发布日期
状态
Closed
DB Reference No
GN-P345605-08/14
Deadline (local time):
图像
图像
W
Brazil
Inter-American Development Bank
Last updated on 08/08/2014
Favorite this item
标签
Contratação de empresa de construção civil para reforma das instalações físicas da Agência de Atendimento da Secretaria da Fazenda no município de Uruçuí/PI
Project
Projeto de Desenvolvimento e Aperfeiçoamento da Gestão Fiscal do Estado do Piauí (PROFISCO)
发布日期
状态
Closed
DB Reference No
IDB-P345602-08/14
Deadline (local time):
图像
C
Brazil
Inter-American Development Bank
Last updated on 08/08/2014
Favorite this item
标签
Contratação de empresa para proceder à atualização, complementação e conferência dos dados cadastrais, serviços estes denominados Censo Previdenciário.
Project
Programa de Apoio à Modernização da Gestão do Sistema de Previdência Social (PROPREV – Segunda Fase)
发布日期
状态
Closed
DB Reference No
IDB-P345665-08/14
Deadline (local time):
图像
Regional - Latin America and The Caribbean
Inter-American Development Bank
Last updated on 08/08/2014
Favorite this item
标签
GENERAL PROCUREMENT NOTICE
Project
Support for CARILEC’s Climate Change Adaptation and Sustainable Energy Programming
发布日期
状态
N/A
DB Reference No
IDB-P345662-08/14
图像
C
United States
Organization of American States
Last updated on 08/08/2014
Favorite this item
标签
EVALUATION OF THE INTER-AMERICAN PROGRAM ON EDUCATION FOR DEMOCRATIC VALUES AND PRACTICES (EDUCADEM)
Project
<B>UPDATE</B> - REQUEST FOR PROPOSALS
发布日期
状态
Closed
DB Reference No
OAS-P345659-08/14
Deadline (local time):
图像
C
Ecuador
Inter-American Development Bank
Last updated on 08/08/2014
Favorite this item
标签
ESTUDIO DE LA LINEA DE SUBTRANSMISION A 69 KV. YAGUACHI - BABAHOYO, DE 38 KM., DE LONG. CONDUCTOR 500 MCM ACAR, NEUTRO CON OPGW DE 24 FIBRAS, INCLUYE FRANJA DE SERVIDUMBRE
Project
PROGRAMA DE REFORZAMIENTO DEL SISTEMA NACIONAL DE DISTRIBUCIÓN
发布日期
状态
Closed
DB Reference No
IDB-P345656-08/14
Deadline (local time):
图像
W
Pakistan
Asian Development Bank
Last updated on 08/08/2014
Favorite this item
标签
Procurement of 132 kV Grid Station Equipment
Project
Power Distribution Enhancement Investment Program, Tranche-IV
发布日期
状态
Closed
DB Reference No
ADB-P345653-08/14
Deadline (local time):
图像
C
Uganda
World Bank
Last updated on 07/08/2014
Favorite this item
标签
Consultancy Services for Preparation of a Strategic Environmental and Social Assessment (SESA) For Uganda’s National REDD+ Programme
Project
<B>UPDATE</B> - REDD+ Readiness Preparation Support
发布日期
状态
Closed
DB Reference No
WB-P345497-08/14
Deadline (local time):
图像
C
Uganda
World Bank
Last updated on 07/08/2014
Favorite this item
标签
Consultancy Services for Preparation of a Strategic Environmental and Social Assessment (SESA) for Uganda’s National REDD+ Programme
Project
<B>DUPLICATE NOTICE</B> - REDD+ Readiness Preparation Support Project
发布日期
状态
Closed
DB Reference No
WB-P345494-08/14
Deadline (local time):
图像
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
标签
Assist in the Improvement of Natural Gas Reserves and Resources Estimates in Peru
Project
eConsult: Peru Developing a New Natural Gas Development and Use Policy
发布日期
状态
Closed
DB Reference No
WB-P345491-08/14
Deadline (local time):
图像
C
Uganda
World Bank
Last updated on 07/08/2014
Favorite this item
标签
Consultancy Services for Strengthening National Feedback and Grievance Redress Mechanism for Redd+ for Uganda’s Redd+ Programme
Project
<B>UPDATE</B> - REDD+ Readiness Preparation Support Project
发布日期
状态
Closed
DB Reference No
WB-P345488-08/14
Deadline (local time):
图像
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
标签
Support Implementation of World Bank project 'Developing a New Natural Gas Use Policy for Peru'
Project
eConsult: Peru Developing a New Natural Gas Development and Use Policy
发布日期
状态
Closed
DB Reference No
WB-P345485-08/14
Deadline (local time):
图像
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
标签
Revision of Existing Natural Gas Transport and Distribution Contracts in Peru
Project
eConsult: Peru Developing a New Natural Gas Development and Use Policy
发布日期
状态
Closed
DB Reference No
WB-P345482-08/14
Deadline (local time):
图像
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
标签
Assess and Reinforce the Natural Gas Massification Plan
Project
eConsult: Peru Developing a New Natural Gas Development and Use Policy
发布日期
状态
Closed
DB Reference No
WB-P345479-08/14
Deadline (local time):
图像
C
Nigeria
World Bank
Last updated on 07/08/2014
Favorite this item
标签
Selection of Consultants for Design of Enhanced Business Processes & Change Management Strategy for Institutionalizing Road Asset Management
Project
Federal Roads Development Project
发布日期
状态
Closed
DB Reference No
WB-P345476-08/14
Deadline (local time):
图像
W
Sri Lanka
Asian Development Bank
Last updated on 07/08/2014
Favorite this item
标签
Supply, Installation & Commissioning of SIV Meters and Supply & Delivery of Electromagnetic Flow Meters for Use in DMA Implementation; Supply, Installation & Commissioning of AMR Meters and Supply, Delivery & Installation of IT Equipment
Project
<B>UPDATE</B> - Greater Colombo Water & Wastewater Management Improvement Investment Programme – Project 1
发布日期
状态
Closed
DB Reference No
ADB-P345473-08/14
Deadline (local time):
图像
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
标签
Developing a Gas Master Plan for the North and South of Peru
Project
eConsult: Peru Developing a New Natural Gas Development and Use Policy
发布日期
状态
Closed
DB Reference No
WB-P345470-08/14
Deadline (local time):
图像
C
Mozambique
World Bank
Last updated on 07/08/2014
Favorite this item
标签
Consultancy Service for Reviewing the Maputo Municipality Urban Structure Plan - (PEUMM - Plano de Estrutura Ubana do Munícipio de Maputo)
Project
Programa de Desenvolvimento do Municipio De Maputo II – PROMAPUTO II
发布日期
状态
Closed
DB Reference No
WB-P345467-08/14
Deadline (local time):
图像
C
Uzbekistan
World Bank
Last updated on 07/08/2014
Favorite this item
Deadline (local time):
图像
C
North Macedonia
World Bank
Last updated on 07/08/2014
Favorite this item
标签
Assessing the Impact on Poverty Reduction and Social Inclusion through Improved Connectivity along Rehabilitated/Upgraded Roads and Capacity Building to Streamline Poverty Reduction
Project
eConsult: Assessing the Impact on Poverty Reduction and Social Inclusion through Improved Connectivity along Newly Rehabilitated/Upgraded Roads and capacity building to streamline poverty reduction consideration in investment planning
发布日期
状态
Closed
DB Reference No
WB-P345461-08/14
Deadline (local time):