Site search

145032 results

Изображение
transportation
W
Liberia
Government Organization
Last updated on 08/08/2014
Favorite this item
Метка

Rehabilitation and upgrading runway 04-22 at Roberts International Airport which shall be undertaken whilst the airport remains operational

Project REHABILITATION AND UPGRADING OF RUNWAY 04-22 AT ROBERTS INTERNATIONAL AIRPORT
Дата публикации
Статус Closed
DB Reference No GN-P345605-08/14
Deadline (local time):
Изображение
Construction
Изображение
Social services
W
Brazil
Inter-American Development Bank
Last updated on 08/08/2014
Favorite this item
Метка

Contratação de empresa de construção civil para reforma das instalações físicas da Agência de Atendimento da Secretaria da Fazenda no município de Uruçuí/PI

Project Projeto de Desenvolvimento e Aperfeiçoamento da Gestão Fiscal do Estado do Piauí (PROFISCO)
Дата публикации
Статус Closed
DB Reference No IDB-P345602-08/14
Deadline (local time):
Изображение
Rural
C
Brazil
Inter-American Development Bank
Last updated on 08/08/2014
Favorite this item
Метка

Contratação de empresa para proceder à atualização, complementação e conferência dos dados cadastrais, serviços estes denominados Censo Previdenciário.

Project Programa de Apoio à Modernização da Gestão do Sistema de Previdência Social (PROPREV – Segunda Fase)
Дата публикации
Статус Closed
DB Reference No IDB-P345665-08/14
Deadline (local time):
Изображение
Energy
Regional - Latin America and The Caribbean
Inter-American Development Bank
Last updated on 08/08/2014
Favorite this item
Метка

GENERAL PROCUREMENT NOTICE

Project Support for CARILEC’s Climate Change Adaptation and Sustainable Energy Programming
Дата публикации
Статус N/A
DB Reference No IDB-P345662-08/14
Изображение
Education
C
United States
Organization of American States
Last updated on 08/08/2014
Favorite this item
Метка

EVALUATION OF THE INTER-AMERICAN PROGRAM ON EDUCATION FOR DEMOCRATIC VALUES AND PRACTICES (EDUCADEM)

Project <B>UPDATE</B> - REQUEST FOR PROPOSALS
Дата публикации
Статус Closed
DB Reference No OAS-P345659-08/14
Deadline (local time):
Изображение
Energy
C
Ecuador
Inter-American Development Bank
Last updated on 08/08/2014
Favorite this item
Метка

ESTUDIO DE LA LINEA DE SUBTRANSMISION A 69 KV. YAGUACHI - BABAHOYO, DE 38 KM., DE LONG. CONDUCTOR 500 MCM ACAR, NEUTRO CON OPGW DE 24 FIBRAS, INCLUYE FRANJA DE SERVIDUMBRE

Project PROGRAMA DE REFORZAMIENTO DEL SISTEMA NACIONAL DE DISTRIBUCIÓN
Дата публикации
Статус Closed
DB Reference No IDB-P345656-08/14
Deadline (local time):
Изображение
Energy
W
Pakistan
Asian Development Bank
Last updated on 08/08/2014
Favorite this item
Метка

Procurement of 132 kV Grid Station Equipment

Project Power Distribution Enhancement Investment Program, Tranche-IV
Дата публикации
Статус Closed
DB Reference No ADB-P345653-08/14
Deadline (local time):
Изображение
Miscellaneous
C
Uganda
World Bank
Last updated on 07/08/2014
Favorite this item
Метка

Consultancy Services for Preparation of a Strategic Environmental and Social Assessment (SESA) For Uganda’s National REDD+ Programme

Project <B>UPDATE</B> - REDD+ Readiness Preparation Support
Дата публикации
Статус Closed
DB Reference No WB-P345497-08/14
Deadline (local time):
Изображение
Miscellaneous
C
Uganda
World Bank
Last updated on 07/08/2014
Favorite this item
Метка

Consultancy Services for Preparation of a Strategic Environmental and Social Assessment (SESA) for Uganda’s National REDD+ Programme

Project <B>DUPLICATE NOTICE</B> - REDD+ Readiness Preparation Support Project
Дата публикации
Статус Closed
DB Reference No WB-P345494-08/14
Deadline (local time):
Изображение
Energy
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
Метка

Assist in the Improvement of Natural Gas Reserves and Resources Estimates in Peru

Project eConsult: Peru Developing a New Natural Gas Development and Use Policy
Дата публикации
Статус Closed
DB Reference No WB-P345491-08/14
Deadline (local time):
Изображение
Miscellaneous
C
Uganda
World Bank
Last updated on 07/08/2014
Favorite this item
Метка

Consultancy Services for Strengthening National Feedback and Grievance Redress Mechanism for Redd+ for Uganda’s Redd+ Programme

Project <B>UPDATE</B> - REDD+ Readiness Preparation Support Project
Дата публикации
Статус Closed
DB Reference No WB-P345488-08/14
Deadline (local time):
Изображение
Energy
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
Метка

Support Implementation of World Bank project 'Developing a New Natural Gas Use Policy for Peru'

Project eConsult: Peru Developing a New Natural Gas Development and Use Policy
Дата публикации
Статус Closed
DB Reference No WB-P345485-08/14
Deadline (local time):
Изображение
Energy
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
Метка

Revision of Existing Natural Gas Transport and Distribution Contracts in Peru

Project eConsult: Peru Developing a New Natural Gas Development and Use Policy
Дата публикации
Статус Closed
DB Reference No WB-P345482-08/14
Deadline (local time):
Изображение
Energy
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
Метка

Assess and Reinforce the Natural Gas Massification Plan

Project eConsult: Peru Developing a New Natural Gas Development and Use Policy
Дата публикации
Статус Closed
DB Reference No WB-P345479-08/14
Deadline (local time):
Изображение
transportation
C
Nigeria
World Bank
Last updated on 07/08/2014
Favorite this item
Метка

Selection of Consultants for Design of Enhanced Business Processes & Change Management Strategy for Institutionalizing Road Asset Management

Project Federal Roads Development Project
Дата публикации
Статус Closed
DB Reference No WB-P345476-08/14
Deadline (local time):
Изображение
water, sanitation, and waste management icon
W
Sri Lanka
Asian Development Bank
Last updated on 07/08/2014
Favorite this item
Метка

Supply, Installation & Commissioning of SIV Meters and Supply & Delivery of Electromagnetic Flow Meters for Use in DMA Implementation; Supply, Installation & Commissioning of AMR Meters and Supply, Delivery & Installation of IT Equipment

Project <B>UPDATE</B> - Greater Colombo Water & Wastewater Management Improvement Investment Programme – Project 1
Дата публикации
Статус Closed
DB Reference No ADB-P345473-08/14
Deadline (local time):
Изображение
Energy
C
Peru
World Bank
Last updated on 07/08/2014
Favorite this item
Метка

Developing a Gas Master Plan for the North and South of Peru

Project eConsult: Peru Developing a New Natural Gas Development and Use Policy
Дата публикации
Статус Closed
DB Reference No WB-P345470-08/14
Deadline (local time):
Изображение
Miscellaneous
C
Mozambique
World Bank
Last updated on 07/08/2014
Favorite this item
Метка

Consultancy Service for Reviewing the Maputo Municipality Urban Structure Plan - (PEUMM - Plano de Estrutura Ubana do Munícipio de Maputo)

Project Programa de Desenvolvimento do Municipio De Maputo II – PROMAPUTO II
Дата публикации
Статус Closed
DB Reference No WB-P345467-08/14
Deadline (local time):
Изображение
Energy
C
Uzbekistan
World Bank
Last updated on 07/08/2014
Favorite this item
Метка

Gas and Power Engineer

Project eConsult notice
Дата публикации
Статус Closed
DB Reference No WB-P345464-08/14
Deadline (local time):
Изображение
transportation
C
North Macedonia
World Bank
Last updated on 07/08/2014
Favorite this item
Метка

Assessing the Impact on Poverty Reduction and Social Inclusion through Improved Connectivity along Rehabilitated/Upgraded Roads and Capacity Building to Streamline Poverty Reduction

Project eConsult: Assessing the Impact on Poverty Reduction and Social Inclusion through Improved Connectivity along Newly Rehabilitated/Upgraded Roads and capacity building to streamline poverty reduction consideration in investment planning
Дата публикации
Статус Closed
DB Reference No WB-P345461-08/14
Deadline (local time):